Royalty Statement

State: Odisha District: Puri Block: Kanas Gram Panchayat: Kadua
Work Code: OD/369/3541/120984/410114/00054993 (IMP. OF ROAD WITH CC/GR.II METALLING FROM BAJARANGI TEMPLE TO SANAORA UP SCHOOL )
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kanas Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 24-09-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: GOPINATH PALAI
Administrative Approval Details
Approval No.: OD/369/3541/120984/410114/00054993/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3541/120984/410114/00054993/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 186532
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0401) :.R.C.C work - 'Reinforced cement concrete (1:2:4) work with 12mm size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (To be used for minor repair work only) 15.249 Cum 3.23 49.25427 0.45 6.86205 0.9 13.7241 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.22 Sqm - - - - - - 0.00267 0.0299574 0.000614 0.00688908 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.35 Cum 2.29 23.7015 0.48 4.968 - - - - - - 0.96 9.936
Total Qty 72.95577 11.83005 13.7241 0.0299574 0.00688908 9.936
Rate Per Unit 0 115.5 320 0 0 320
Total Amount 0 1366.370775 4391.712 0 0 3179.52
Total Royalty Amount (in Rs.): 8937.602775