State: Odisha District: Mayurbhanj Block: Rasgovindpur Gram Panchayat: Amarda
Work Code: OD/365/3505/120314/390152/00055222 (Const. of CC road from RD road to Anjan Das house at P.C Pur)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Rasgovindpur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 04-10-2025
Date of Completion: 11-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: RABILAL SOREN
Administrative Approval Details
Approval No.: OD/365/3505/120314/390152/00055222/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3505/120314/390152/00055222/TS
Fund Sanction No.: 9442
Fund Sanction Amount (in Rs.): 152416
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.28101458 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.58128983 Cum 1 7.58128983 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 11.88239741 Cum - - 2.29 27.2106900689 0.48 5.7035507568 0.96 11.4071015136 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.364639 Sqm - - - - - - - - 0.00267 0.09175358613 0.000614 0.021099888346 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.148458 Cum - - 3.23 19.85951934 0.45 2.7668061 - - - - - - 0.9 5.5336122
Total Qty 7.58128983 47.0702094089 8.4703568568 11.4071015136 0.09175358613 0.021099888346 5.5336122
Rate Per Unit 522.25 0 522.25 551.5 0 0 551.5
Total Amount 3959.3286137175 0 4423.6438684638 6291.0164847504 0 0 3051.7871283
Total Royalty Amount (in Rs.): 17725.776095232