| State: Odisha |
District: Nayagarh |
Block: Bhapur |
Gram Panchayat: Bijipur |
Work Code: OD/367/3523/120594/406113/00055961 (Major Repairing of Door of Girls & Boys Toilet , Smart Class Roof grading, electrification of RCS High School, Bijipur)
Project Category: Building
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bhapur |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 27-10-2025 |
| Date of Completion: 11-01-2026 |
Scheme Name: Asset Management School and Mass Education Department |
| Scheme Component Name: Self/Personal Deposit |
Project Sub-Category: Secondary School |
| Project Type: Repair and Maintenance |
Name of Executant: Gayatri Khatua |
Administrative Approval Details
Approval No.: OD/367/3523/120594/406113/00055961/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3523/120594/406113/00055961/TS
Fund Sanction No.: 8559
Fund Sanction Amount (in Rs.): 150000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM341 |
BRM340 |
BRM028 |
BRM064 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1621) :.First floor - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
197.87 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. |
2.205 |
Qntl |
1 |
2.205 |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) |
197.87 |
Sqm |
- |
- |
0.1208 |
23.902696 |
0.0169 |
3.344003 |
0.0169 |
3.344003 |
| Total Qty |
2.205 |
23.902696 |
3.344003 |
3.344003 |
| Rate Per Unit |
0 |
0 |
305.25 |
199.5 |
| Total Amount |
0 |
0 |
1020.75691575 |
667.1285985 |
Total Royalty Amount (in Rs.): 1687.88551425