Royalty Statement

State: Odisha District: Jagatsinghpur Block: Tirtol Gram Panchayat: Kostimallikapur
Work Code: OD/355/3393/118224/397696/00056736 (CONSTRUCTION OF CC ROAD FROM NARUA MULISINGH RD ROAD TO CHINAPADA VILLAGE ROAD.)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Tirtol Bill Status: Final Bill
Proposal Date: - Date of Commencement: 17-10-2025
Date of Completion: 11-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: RAMACHANDRA SARANGI
Administrative Approval Details
Approval No.: OD/355/3393/118224/397696/00056736/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118224/397696/00056736/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.5522583712 Cum 2.29 33.324671670048 0.48 6.985084018176 0.96 13.970168036352 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.769538391808 Cum 3.23 31.55560900554 0.45 4.3962922763136 - - 0.9 8.7925845526272 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.747346902 Sqm - - - - - - - - 0.00267 0.07675541622834 0.000614 0.017650870997828 - -
4 Earth Work (AR0101aa) :.Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 1.1387176368 Cum - - - - - - - - - - - - - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.026235564 Cum - - - - - - - - - - - - 1 10.026235564
Total Qty 64.880280675588 11.38137629449 13.970168036352 8.7925845526272 0.07675541622834 0.017650870997828 10.026235564
Rate Per Unit 0 199.25 444.5 444.5 0 0 199.25
Total Amount 0 2267.7392266771 6209.7396921585 3908.3038336428 0 0 1997.727436127
Total Royalty Amount (in Rs.): 14383.510188605