Royalty Statement

State: Odisha District: Bhadrak Block: Dhamanagar Gram Panchayat: Mustafapur
Work Code: OD/348/3327/275239/394682/00057126 (R/R OF C.C ROAD OF RAGHU MAJHI HOUSE TO JENA SAHI BHAGABAT GADI AT RAGHUNATHPUR )
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Dhamanagar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 11-11-2025
Date of Completion: 15-11-2025 Scheme Name: Severe Cyclonic Storm DANA 2024
Scheme Component Name: Self/Personal Deposit Project Sub-Category: CC Road
Project Type: New Work Name of Executant: ASHISH KUMAR SETHY
Administrative Approval Details
Approval No.: OD/348/3327/275239/394682/00057126/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3327/275239/394682/00057126/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 198000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.7271988 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.686323548 Cum 1 13.686323548 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.1686379488 Cum - - 2.29 37.026180902752 0.48 7.760946215424 0.96 15.521892430848 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 38.022039198 Sqm - - - - - - - - 0.00267 0.10151884465866 0.000614 0.023345532067572 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.2933431479808 Cum - - 3.23 30.017498367978 0.45 4.1820044165914 - - - - - - 0.9 8.3640088331827
Total Qty 13.686323548 67.04367927073 11.942950632015 15.521892430848 0.10151884465866 0.023345532067572 8.3640088331827
Rate Per Unit 45.5 0 45.5 169 0 0 169
Total Amount 622.727721434 0 543.4042537567 2623.1998208133 0 0 1413.5174928079
Total Royalty Amount (in Rs.): 5202.8492888119