Royalty Statement

State: Odisha District: Jajpur Block: Rasulpur Gram Panchayat: Maheswarpur
Work Code: OD/356/3402/118475/401162/00061113 (IMPROVEMENT OF ROAD FROM ARJUNA HOUSE TO BEHERA SAHI )
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Rasulpur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 18-10-2025
Date of Completion: 28-10-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SUSHIL HEMBRAM
Administrative Approval Details
Approval No.: OD/356/3402/118475/401162/00061113/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3402/118475/401162/00061113/TS
Fund Sanction No.: 4303
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) :.Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 0.885 Cum - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.7949 Cum 2.29 29.300321 0.48 6.141552 0.96 12.283104 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.9431175 Cum 3.23 48.266269525 0.45 6.724402875 - - 0.9 13.44880575 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 4.409 Sqm - - - - - - - - 0.00267 0.01177203 0.000614 0.002707126
Total Qty 77.566590525 12.865954875 12.283104 13.44880575 0.01177203 0.002707126
Rate Per Unit 0 274.25 444.5 444.5 0 0
Total Amount 0 3528.4881244687 5459.839728 5977.994155875 0 0
Total Royalty Amount (in Rs.): 14966.322008344