Royalty Statement

State: Odisha District: Balasore Block: Bahanaga Gram Panchayat: Khantapada
Work Code: OD/346/3298/116055/393880/00061657 (IMPUT OF ROAD FROM TIKINA PUTY HOUSE TO CHINTAMANI HOUSE)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Bahanaga Bill Status: Final Bill
Proposal Date: 13-07-2018 Date of Commencement: 12-12-2025
Date of Completion: 04-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: SARASWATI DHADA
Administrative Approval Details
Approval No.: OD/346/3298/116055/393880/00061657/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3298/116055/393880/00061657/TS
Fund Sanction No.: 9122
Fund Sanction Amount (in Rs.): 119500
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 1.380444 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.06787328 Cum 1 7.06787328 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 8.89005936 Cum - - 2.29 20.3582359344 0.48 4.2672284928 0.96 8.5344569856 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.40526016 Cum - - 3.23 20.6889903168 0.45 2.882367072 - - 0.9 5.764734144 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.0629287 Sqm - - - - - - - - - - 0.00267 0.042888019629 0.000614 0.0098626382218
Total Qty 7.06787328 41.0472262512 7.1495955648 8.5344569856 5.764734144 0.042888019629 0.0098626382218
Rate Per Unit 442.25 0 442.25 552.5 552.5 0 0
Total Amount 3125.76695808 0 3161.9086385328 4715.287484544 3185.01561456 0 0
Total Royalty Amount (in Rs.): 14187.978695717