Royalty Statement

State: Odisha District: Ganjam Block: Buguda Gram Panchayat: Balipadar
Work Code: OD/354/3368/117656/410451/00062142 (Repar & Maintenance of Market Complex at Balipadar)
Project Category: Building
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Buguda Bill Status: Final Bill
Proposal Date: - Date of Commencement: 06-11-2025
Date of Completion: 14-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Capital Assets Project Sub-Category: Market Complex
Project Type: Repair and Maintenance Name of Executant: Prasan Kumar Sahu
Administrative Approval Details
Approval No.: OD/354/3368/117656/410451/00062142/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3368/117656/410451/00062142/TS
Fund Sanction No.: 7735
Fund Sanction Amount (in Rs.): 500000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM064 BRM140 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 421.821890865 Sqm 0.1208 50.956084416492 0.0169 7.1287899556185 0.0169 7.1287899556185 - - - -
2 miscellaneous(ARM029) :.Doors-Taking out the door or window shutters and refixing them including screws as may be required.(Doors and Window) and as directed by Engineer-in-Charge. - Doors-Taking out the door or window shutters and refixing them including screws as may be required.(Doors and Window) and as directed by Engineer-in-Charge. 980 Each - - - - - - - - - -
3 Painting(AR0920b) :.Finishing wall surface with two coats with plastic emulsion paint of approved shades above one coat waterbound Primer on new work (Inside) - Finishing wall surface with two coats with plastic emulsion paint of approved shades above one coat waterbound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1557.147183 Sqm - - - - - - 0.125 194.643397875 0.084 130.800363372
Total Qty 50.956084416492 7.1287899556185 7.1287899556185 194.643397875 130.800363372
Rate Per Unit 0 205.25 254.5 0 0
Total Amount 0 1463.1841383907 1814.2770437049 0 0
Total Royalty Amount (in Rs.): 3277.4611820956