Royalty Statement

State: Odisha District: Balangir Block: Belpara Gram Panchayat: Parlimal
Work Code: OD/345/3287/115838/420929/00063517 (CONSTRUCTION OF CEMENT OCNCRETE ROA AT MUNNAPALI UPPERPADA)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Belpara Bill Status: Final Bill
Proposal Date: 01-07-2023 Date of Commencement: 04-11-2025
Date of Completion: 12-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: JAGUNA NANDA SAMARTHA
Administrative Approval Details
Approval No.: OD/345/3287/115838/420929/00063517/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3287/115838/420929/00063517/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101a) :.Earthwork in ordinary soil within 50m, initial lead and 1.5m, initial lift - Earth work in ordinary soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 9.255384 Cum - - - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.316194 Cum 2.29 69.42408426 0.48 14.55177312 0.96 29.10354624 - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.00884 Cum 3.23 51.7085532 0.45 7.203978 - - 0.9 14.407956 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 48.9888 Sqm - - - - - - - - 0.00267 0.130800096 0.000614 0.0300791232 - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 24.07887 Cum - - - - - - - - - - - - 1 24.07887
Total Qty 121.13263746 21.75575112 29.10354624 14.407956 0.130800096 0.0300791232 24.07887
Rate Per Unit 0 55.25 189.5 189.5 0 0 55.25
Total Amount 0 1202.00524938 5515.12201248 2730.307662 0 0 1330.3575675
Total Royalty Amount (in Rs.): 10777.79249136