| State: Odisha |
District: Kalahandi |
Block: Narala |
Gram Panchayat: Muskuti |
Work Code: OD/358/3420/118836/422327/00064529 (REPAIR & MAINTENANCE OF KENDUPADA PRIMARY SCHOOL)
Project Category: Building
| Financial Year: 2022-23 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Narala |
Bill Status:
1st Bill
|
| Proposal Date: - |
Date of Commencement: 02-12-2025 |
| Date of Completion: - |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance of Primary School Building |
Project Sub-Category: Elementary School |
| Project Type: Repair and Maintenance |
Name of Executant: SUKANTI BISWAL |
Administrative Approval Details
Approval No.: OD/358/3420/118836/422327/00064529/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3420/118836/422327/00064529/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 120000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM005 |
BRM341 |
BRM060 |
BRM052 |
BRM003 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
12.888 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
1.799172 |
Cum |
1 |
1.799172 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.8 |
Cum |
- |
- |
2.29 |
4.122 |
0.48 |
0.864 |
0.96 |
1.728 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Masonry Brick Work (AR06059) :.Brick work with K.B. bricks 25cm x 12cm x 8cm - Brick work with K.B. bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:3) in foundation and plinth |
2.87645 |
Cum |
- |
- |
1.33 |
3.8256785 |
0.28 |
0.805406 |
- |
- |
350 |
1006.7575 |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. |
2.13 |
Qntl |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1.05 |
2.2365 |
- |
- |
- |
- |
- |
- |
| 6 |
R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) |
4.10257 |
Cum |
- |
- |
3.4733 |
14.249456381 |
0.45 |
1.8461565 |
- |
- |
- |
- |
- |
- |
0.36 |
1.4769252 |
0.54 |
2.2153878 |
- |
- |
| 7 |
Masonry Brick Work (AR0602i) :.K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with K.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immerging the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
7.81908 |
Cum |
- |
- |
1 |
7.81908 |
0.28 |
2.1893424 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
350 |
2736.678 |
| Total Qty |
1.799172 |
30.016214881 |
5.7049049 |
1.728 |
1006.7575 |
2.2365 |
1.4769252 |
2.2153878 |
2736.678 |
| Rate Per Unit |
42.25 |
0 |
42.25 |
184.5 |
0 |
0 |
184.5 |
184.5 |
0.04025 |
| Total Amount |
76.015017 |
0 |
241.032232025 |
318.816 |
0 |
0 |
272.4926994 |
408.7390491 |
110.1512895 |
Total Royalty Amount (in Rs.): 1427.246287025