Royalty Statement

State: Odisha District: Jagatsinghpur Block: Tirtol Gram Panchayat: Kolar
Work Code: OD/355/3393/118223/397519/00066219 (IMPROVEMENT OF ROAD FROM NARENDRA JENA HOUSE TO HOLDING SHOP, VILL- NAGAPURA, GP- KOLAR)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Tirtol Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-12-2025
Date of Completion: 30-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: LIPSA SAMAL
Administrative Approval Details
Approval No.: OD/355/3393/118223/397519/00066219/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118223/397519/00066219/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101a) :.Earthwork in ordinary soil within 50m, initial lead and 1.5m, initial lift - Earth work in ordinary soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 2.88 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.034 Cum 1 17.034 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.834 Cum - - 2.29 43.12986 0.48 9.04032 0.96 18.08064 - - - - - -
4 Concrete (AR0307) :.First floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.07 Cum - - 3.23 55.1361 0.45 7.6815 - - 0.9 15.363 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.8 Sqm - - - - - - - - - - 0.00267 0.092916 0.000614 0.0213672
Total Qty 17.034 98.26596 16.72182 18.08064 15.363 0.092916 0.0213672
Rate Per Unit 199.25 0 199.25 444.5 444.5 0 0
Total Amount 3394.0245 0 3331.822635 8036.84448 6828.8535 0 0
Total Royalty Amount (in Rs.): 21591.545115