Royalty Statement

State: Odisha District: Nuapada Block: Komna Gram Panchayat: Kurumpur
Work Code: OD/368/3533/120811/421804/00066272 (CONSTRUCTI ON OF CC ROAD FROM RD ROAD TO MIP LATKANPADA OF KURUMPURI GP 5THS)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Komna Bill Status: Final Bill
Proposal Date: - Date of Commencement: 03-12-2025
Date of Completion: 12-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Pradeep Kumar Sahoo
Administrative Approval Details
Approval No.: OD/368/3533/120811/421804/00066272/AS
Technical Sanction Details
Technical Sanction No.: OD/368/3533/120811/421804/00066272/TS
Fund Sanction No.: 14036
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 42.413 Cum 1 42.413 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 42.413 Cum - - 2.29 97.12577 0.48 20.35824 0.96 40.71648 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 21.2065 Cum - - 3.23 68.496995 0.45 9.542925 - - 0.9 19.08585 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.86 Sqm - - - - - - - - - - 0.00267 0.0930762 0.000614 0.02140404
Total Qty 42.413 165.622765 29.901165 40.71648 19.08585 0.0930762 0.02140404
Rate Per Unit 71.25 0 71.25 175.5 175.5 0 0
Total Amount 3021.92625 0 2130.45800625 7145.74224 3349.566675 0 0
Total Royalty Amount (in Rs.): 15647.69317125