Royalty Statement

State: Odisha District: Sundargarh Block: Koida Gram Panchayat: Jamudihi
Work Code: OD/373/3579/121614/384720/00066303 (Construction of CC Road from RD Road to Kudamusa Singh House)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Koida Bill Status: 1st Bill
Proposal Date: 25-09-2025 Date of Commencement: 15-12-2025
Date of Completion: - Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SANJAY KUMAR NAYAK
Administrative Approval Details
Approval No.: OD/373/3579/121614/384720/00066303/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3579/121614/384720/00066303/TS
Fund Sanction No.: 06/2025/26
Fund Sanction Amount (in Rs.): 338428
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.32 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 19.73 Cum 1 19.73 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 28.05 Cum - - 2.29 64.2345 0.48 13.464 0.96 26.928 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.65 Cum - - 3.23 73.1595 0.45 10.1925 - - 0.9 20.385
Total Qty 19.73 137.394 23.6565 26.928 20.385
Rate Per Unit 46.25 0 46.25 259.5 259.5
Total Amount 912.5125 0 1094.113125 6987.816 5289.9075
Total Royalty Amount (in Rs.): 14284.349125