Royalty Statement

State: Odisha District: Sundargarh Block: Sundargarh Gram Panchayat: Majhapara
Work Code: OD/373/3588/121767/383819/00068123 (Construction of Cement Concrete Road from Radheshyam House to AWC Centre at Sunamunda)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Sundargarh Bill Status: Final Bill
Proposal Date: 22-10-2025 Date of Commencement: 15-12-2025
Date of Completion: 23-12-2025 Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Maharagu Pradhan
Administrative Approval Details
Approval No.: OD/373/3588/121767/383819/00068123/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3588/121767/383819/00068123/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 500000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 71.593 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 32.0245 Cum 1 32.0245 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 33.9105 Cum - - 2.29 77.655045 0.48 16.27704 0.96 32.55408 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.098 Sqm - - - - - - - - 0.00267 0.09104166 0.000614 0.020936172 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 27.3048 Cum - - 3.23 88.194504 0.45 12.28716 - - - - - - 0.9 24.57432
Total Qty 32.0245 165.849549 28.5642 32.55408 0.09104166 0.020936172 24.57432
Rate Per Unit 410.25 0 410.25 341 0 0 341
Total Amount 13138.051125 0 11718.46305 11100.94128 0 0 8379.84312
Total Royalty Amount (in Rs.): 44337.298575