Royalty Statement

State: Odisha District: Jajpur Block: Badchana Gram Panchayat: Majhipada
Work Code: OD/356/3394/118260/401823/00069726 (Improvement of Banamalipur village road)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Badchana Bill Status: Final Bill
Proposal Date: - Date of Commencement: 23-12-2025
Date of Completion: 13-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Swati Das
Administrative Approval Details
Approval No.: OD/356/3394/118260/401823/00069726/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3394/118260/401823/00069726/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 143704
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.9 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.3 Cum 1 9.3 - - - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.556 Cum - - 3.23 27.63588 0.45 3.8502 0.9 7.7004 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 18 Sqm - - - - - - - - 0.00267 0.04806 0.000614 0.011052 - -
5 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.2 Cum - - 2.29 23.358 0.48 4.896 - - - - - - 0.96 9.792
Total Qty 9.3 50.99388 8.7462 7.7004 0.04806 0.011052 9.792
Rate Per Unit 314.5 0 314.5 594 0 0 594
Total Amount 2924.85 0 2750.6799 4574.0376 0 0 5816.448
Total Royalty Amount (in Rs.): 16066.0155