State: Odisha District: Ganjam Block: Surada Gram Panchayat: Gazalabadi
Work Code: OD/354/3385/118024/410820/00070630 (Improve of C/Paver Road from Ramanabadi Mandir to Rahaganda Road)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Surada Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 22-12-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: ADITYA BEHERA
Administrative Approval Details
Approval No.: OD/354/3385/118024/410820/00070630/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3385/118024/410820/00070630/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 350000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 8.49504 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 16.8201792 Cum 1 16.8201792 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 19.11384 Cum - - 2.29 43.7706936 0.48 9.1746432 0.96 18.3492864 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.7037504 Cum - - 3.23 34.573113792 0.45 4.81668768 - - 0.9 9.63337536 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 60.201144 Sqm - - - - - - - - - - 0.00267 0.16073705448 0.000614 0.036963502416
Total Qty 16.8201792 78.343807392 13.99133088 18.3492864 9.63337536 0.16073705448 0.036963502416
Rate Per Unit 205.25 0 205.25 290.5 290.5 0 0
Total Amount 3452.3417808 0 2871.72066312 5330.4676992 2798.49554208 0 0
Total Royalty Amount (in Rs.): 14453.0256852