State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Nuapada
Work Code: OD/354/3370/117700/413007/00013114 (Improvement/Completion of Incomplete Kalyan Mandap at Charipada)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Proposal Date: -
Date of Commencement: 29-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Kalyan Mandap Project Type: Repair and Maintenance
Name of Executant: SUCHISMITA MISHRA
Administrative Approval Details
Approval No.: OD/354/3370/117700/413007/00013114/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117700/413007/00013114/TS
Fund Sanction No.: 12762
Fund Sanction Amount (in Rs.): 100000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 458.864 71.84257680551 32965.972163284
2 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 125.04 156.87859381801 19616.099371004
3 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 296.024 94.7676397125 28053.495778253
Total Amount (in Rs.): 80635.567312541
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled
612 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 458.864 Square Meter 0.053763440860215 24.670107526882 0.053763440860215 24.670107526882
2 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 125.04 Square Meter 0.11776344086022 14.725140645161 0.10776344086022 13.474740645161
3 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.024 Square Meter 0.064 18.945536 0.054 15.985296
Total Qty 54.130144172043 58.340784172043
Rate Per Man Day 612 462
Total Amount 33127.64823329 26953.442287484
Total Labour Amount (in Rs.): 60081.090520774
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM255 BRM252 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 458.864 Sqm 0.084 38.544576 - - - - - -
2 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 125.04 Sqm - - 0.125 15.63 0.084 10.50336 - -
3 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.024 Sqm - - - - - - 0.125 37.003
Total Qty 38.544576 15.63 10.50336 37.003
Rate Per Unit 159.39677 195.15677 125.86677 249.70677
Total Amount 6143.8809154195 3050.3003151 1322.0239973472 9239.89961031
Total Material Amount (in Rs.): 19756.104838177
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM255 BRM252 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 458.864 Sqm 0.084 38.544576 - - - - - -
2 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 125.04 Sqm - - 0.125 15.63 0.084 10.50336 - -
3 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.024 Sqm - - - - - - 0.125 37.003
Total Qty 38.544576 15.63 10.50336 37.003
Rate Per Unit 0 0 0 0
Total Amount 0 0 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 1000 Rs. 1000
2 Provision for Contingency @ Rs. 1000 Rs. 1000
3 Display Citizen Board @ Rs. 2000 Rs. 2000
4 Any Other Lumpsum @ Rs. 1000 Rs. 1000
Total Addition Component Amount (in Rs.): 5000
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 85635.567312541