State: Odisha District: Deogarh Block: Tileibani Gram Panchayat: Tainsar
Work Code: OD/351/3348/117235/382706/00014641 (Construction of VSS Building at Badabalipasi)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tileibani Proposal Date: -
Date of Commencement: 16-04-2025 Date of Completion: 18-12-2025
Scheme Name: Construction of Vana Suraksha Samiti Building Scheme Component Name: Construction of Buildings for Vana Suraksha Samiti
Project Sub-Category: Vana Suraksha Samiti Building Project Type: New Work
Name of Executant: MANORANJAN BEHERA
Administrative Approval Details
Approval No.: OD/351/3348/117235/382706/00014641/AS
Technical Sanction Details
Technical Sanction No.: OD/351/3348/117235/382706/00014641/TS
Fund Sanction No.: 18481
Fund Sanction Amount (in Rs.): 850000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0102a) : Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge Cum 32.39325 196.3036 6358.9115907
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. Cum 14.857125 431.852972 6416.0935866255
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 8.59925 5700.63478456 49021.183671128
4 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 13.278001 5309.077666208 70493.938560987
5 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 23.19625 5342.407666208 123923.82382728
6 R.C.C. Work (AR0407Aa) : Column base (including centering & shuttering) - Column base (including centring & shuttering) Cum 5.738445 7019.5819494265 40281.484939777
7 R.C.C. Work (AR0407Ac) : Column & Beam (including centring & shuttering) - Column & Beam (including centring & shuttering) Cum 2.8015 14971.027586746 41941.333784269
8 R.C.C. Work (AR0407Ab) : Plinth beam (including centering & shuttering) - Plinth beam (including centring & shuttering) Cum 1.968125 7772.8690745682 15297.977947385
9 R.C.C. Work (AR0407Ad) : Lintel (including centring & shuttering) - Lintel (including centring & shuttering) Cum 1.098375 13640.057427957 14981.898077432
10 R.C.C. Work (AR0407Ae) : Staircase (including centring & shuttering) - Staircase (including centring & shuttering) Cum 1.89 14861.789393034 28088.781952834
11 R.C.C. Work (AR0407Ag) : Roof (including centring & shuttering) - Roof (including centring & shuttering) Cum 6.0379125 13261.265303817 80070.359543733
12 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. Sqm 38.488 193.7255064008 7456.107290354
13 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. Sqm 126.461 181.8675135712 22999.147633728
14 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 122.94 257.634855352 31673.629116975
15 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. Qntl 17.72 8929.5164338 158231.03120694
16 Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. Sqm 54.089 1529.259715401 82716.128746325
17 Painting (AR0901b) : Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 31.5675 65.032952566133 2052.9277301314
18 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 296.9115 93.56833415 27781.514444978
19 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 31.5675 161.51390667688 5098.5902490224
20 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 296.911 70.751511562133 21006.902049424
Total Amount (in Rs.): 835891.76595002
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
452 552 602 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) : Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 32.39325 Cubic Meter 0.43 13.9290975 - - - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.857125 Cubic Meter 0.1236 1.83634065 - - - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 8.59925 Cubic Meter 3.9 33.537075 - - 0.18 1.547865 - -
4 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 13.278001 Cubic Meter 2.96 39.30288296 - - 1.05 13.94190105 0.35 4.64730035
5 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 23.19625 Cubic Meter 2.96 68.6609 - - 1.05 24.3560625 0.35 8.1186875
6 R.C.C. Work (AR0407Aa) : Column base (including centering & shuttering) - Column base (including centring & shuttering) 5.738445 Cubic Meter 1.3333 7.6510687185 0.1323 0.7591962735 0.175 1.004227875 - -
7 R.C.C. Work (AR0407Ac) : Column & Beam (including centring & shuttering) - Column & Beam (including centring & shuttering) 2.8015 Cubic Meter 1.3333 3.73523995 5.29605 14.836884075 5.33875 14.956508125 - -
8 R.C.C. Work (AR0407Ab) : Plinth beam (including centering & shuttering) - Plinth beam (including centring & shuttering) 1.968125 Cubic Meter 1.3333 2.6241010625 0.3073 0.6048048125 0.35 0.68884375 - -
9 R.C.C. Work (AR0407Ad) : Lintel (including centring & shuttering) - Lintel (including centring & shuttering) 1.098375 Cubic Meter 1.3333 1.4644633875 2.30105 2.52741579375 2.34375 2.57431640625 - -
10 R.C.C. Work (AR0407Ae) : Staircase (including centring & shuttering) - Staircase (including centring & shuttering) 1.89 Cubic Meter 1.3333 2.519937 5.0073 9.463797 5.05 9.5445 - -
11 R.C.C. Work (AR0407Ag) : Roof (including centring & shuttering) - Roof (including centring & shuttering) 6.0379125 Cubic Meter 1.3333 8.05034873625 3.11255 18.793304551875 3.15525 19.051123415625 - -
12 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 38.488 Square Meter 0.17 6.54296 - - 0.14 5.38832 - -
13 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 126.461 Square Meter 0.12 15.17532 - - 0.14 17.70454 - -
14 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 122.94 Square Meter 0.24 29.5056 - - 0.16 19.6704 - -
15 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 17.72 Quintal 0.8 14.176 0.044 0.77968 - - 0.3 5.316
16 Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 54.089 Square Meter 0.325 17.578925 0.76 41.10764 - - 0.325 17.578925
17 Painting (AR0901b) : Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 31.5675 Square Meter 0.053763440860215 1.6971774193548 - - - - 0.053763440860215 1.6971774193548
18 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.9115 Square Meter 0.064 19.002336 - - - - 0.054 16.033221
19 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.5675 Square Meter 0.11827956989247 3.7337903225806 - - - - 0.13440860215054 4.2429435483871
20 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 296.911 Square Meter 0.053763440860215 15.962956989247 - - - - 0.053763440860215 15.962956989247
Total Qty 306.68652069593 130.42860812187 73.597211806989 88.872722506625
Rate Per Man Day 452 552 602 502
Total Amount 138622.30735456 71996.591683275 44305.521507808 44614.106698326
Total Labour Amount (in Rs.): 299538.52724397
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRMMR0025 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM162 BRM341 BRM131 BRMMR0027 BRM137 BRM140 BRM141 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) :.Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 32.39325 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.857125 Cum 1 14.857125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 8.59925 Cum - - 2.29 19.6922825 0.48 4.12764 0.96 8.25528 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 13.278001 Cum - - 0.672 8.922816672 0.28 3.71784028 - - 350 4647.30035 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 23.19625 Cum - - 0.672 15.58788 0.28 6.49495 - - 350 8118.6875 1 23.19625 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0407Aa) :.Column base (including centering & shuttering) - Column base (including centring & shuttering) 5.738445 Cum - - 4.22 24.2162379 0.45 2.58230025 - - - - - - 0.36 2.0658402 0.54 3.0987603 0.004005 0.022982472225 0.189 1.084566105 - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0407Ac) :.Column & Beam (including centring & shuttering) - Column & Beam (including centring & shuttering) 2.8015 Cum - - 4.22 11.82233 0.45 1.260675 - - - - - - 0.36 1.00854 0.54 1.51281 0.041529 0.1163434935 - - 4.4196 12.3815094 - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0407Ab) :.Plinth beam (including centering & shuttering) - Plinth beam (including centring & shuttering) 1.968125 Cum - - 4.22 8.3054875 0.45 0.88565625 - - - - - - 0.36 0.708525 0.54 1.0627875 0.01335 0.02627446875 0.63 1.23991875 - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0407Ad) :.Lintel (including centring & shuttering) - Lintel (including centring & shuttering) 1.098375 Cum - - 4.22 4.6351425 0.45 0.49426875 - - - - - - 0.36 0.395415 0.54 0.5931225 0.0741335 0.0814263830625 - - - - 3.7695 4.1403245625 - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0407Ae) :.Staircase (including centring & shuttering) - Staircase (including centring & shuttering) 1.89 Cum - - 4.22 7.9758 0.45 0.8505 - - - - - - 0.36 0.6804 0.54 1.0206 0.04806 0.0908334 - - - - 1.17 2.2113 - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0407Ag) :.Roof (including centring & shuttering) - Roof (including centring & shuttering) 6.0379125 Cum - - 4.22 25.47999075 0.45 2.717060625 - - - - - - 0.36 2.1736485 0.54 3.26047275 0.0502172 0.303207059595 - - 6.2216 37.56547641 - - - - - - - - - - - - - - - - - -
12 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 38.488 Sqm - - 0.0372 1.4317536 0.0075 0.28866 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 126.461 Sqm - - 0.0358 4.5273038 0.015 1.896915 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 122.94 Sqm - - 0.043 5.28642 0.018 2.21292 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 17.72 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 0.8 14.176 1.05 18.606 - - - - - - - - - - - -
16 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 54.089 Sqm - - 0.1375 7.4372375 0.015 0.811335 - - - - - - - - - - - - - - - - - - - - - - 1 54.089 1 54.089 - - - - - - - -
17 Painting(AR0901b) :.Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 31.5675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 1.704645 - - - - - -
18 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.9115 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 37.1139375 - - - -
19 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.5675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 3.9459375 - -
20 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 296.911 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 24.940524
Total Qty 14.857125 145.320682722 28.340721155 8.25528 12765.98785 23.19625 7.0323687 10.54855305 0.6410672771325 2.324484855 49.94698581 6.3516245625 14.176 18.606 54.089 54.089 1.704645 37.1139375 3.9459375 24.940524
Rate Per Unit 331.46 549.712 1017.41 1336.36 6.30115 33 1991.51 1983.8 58573.086 229.106 250.166 240.106 90.1 6626.752 662.3175001 8.5 143.00732 249.64732 204.30732 159.33732
Total Amount 4924.5426525 79884.523140476 28834.133110309 11032.0259808 80440.404341027 765.47625 14005.032589737 20926.21954059 37549.288755268 532.55342718963 12495.037652144 1525.0631672036 1277.2576 123297.347712 35824.091262909 459.7565 243.7767130014 9265.3950315225 806.1839155125 3973.9562535557
Total Material Amount (in Rs.): 468062.06559575
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM341 BRM131 BRM137 BRM140 BRM141 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) :.Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 32.39325 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.857125 Cum 1 14.857125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 8.59925 Cum - - 2.29 19.6922825 0.48 4.12764 0.96 8.25528 - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 13.278001 Cum - - 0.672 8.922816672 0.28 3.71784028 - - 350 4647.30035 - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 23.19625 Cum - - 0.672 15.58788 0.28 6.49495 - - 350 8118.6875 - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0407Aa) :.Column base (including centering & shuttering) - Column base (including centring & shuttering) 5.738445 Cum - - 4.22 24.2162379 0.45 2.58230025 - - - - 0.36 2.0658402 0.54 3.0987603 0.004005 0.022982472225 0.000921 0.005285107845 - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0407Ac) :.Column & Beam (including centring & shuttering) - Column & Beam (including centring & shuttering) 2.8015 Cum - - 4.22 11.82233 0.45 1.260675 - - - - 0.36 1.00854 0.54 1.51281 0.041529 0.1163434935 - - 0.045339 0.1270172085 - - - - - - - - - - - - - -
8 R.C.C. Work (AR0407Ab) :.Plinth beam (including centering & shuttering) - Plinth beam (including centring & shuttering) 1.968125 Cum - - 4.22 8.3054875 0.45 0.88565625 - - - - 0.36 0.708525 0.54 1.0627875 0.01335 0.02627446875 0.00307 0.00604214375 - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0407Ad) :.Lintel (including centring & shuttering) - Lintel (including centring & shuttering) 1.098375 Cum - - 4.22 4.6351425 0.45 0.49426875 - - - - 0.36 0.395415 0.54 0.5931225 0.0741335 0.0814263830625 - - - - 0.049542 0.05441569425 - - - - - - - - - - - -
10 R.C.C. Work (AR0407Ae) :.Staircase (including centring & shuttering) - Staircase (including centring & shuttering) 1.89 Cum - - 4.22 7.9758 0.45 0.8505 - - - - 0.36 0.6804 0.54 1.0206 0.04806 0.0908334 - - - - 0.01494 0.0282366 - - - - - - - - - - - -
11 R.C.C. Work (AR0407Ag) :.Roof (including centring & shuttering) - Roof (including centring & shuttering) 6.0379125 Cum - - 4.22 25.47999075 0.45 2.717060625 - - - - 0.36 2.1736485 0.54 3.26047275 0.0502172 0.303207059595 - - 0.076659 0.4628603343375 - - - - - - - - - - - - - -
12 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 38.488 Sqm - - 0.0372 1.4317536 0.0075 0.28866 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 126.461 Sqm - - 0.0358 4.5273038 0.015 1.896915 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 122.94 Sqm - - 0.043 5.28642 0.018 2.21292 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 17.72 Qntl - - - - - - - - - - - - - - - - - - - - - - 1.05 18.606 - - - - - - - - - -
16 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 54.089 Sqm - - 0.1375 7.4372375 0.015 0.811335 - - - - - - - - - - - - - - - - - - 1 54.089 - - - - - - - -
17 Painting(AR0901b) :.Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 31.5675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 1.704645 - - - - - -
18 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.9115 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 37.1139375 - - - -
19 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.5675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 3.9459375 - -
20 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 296.911 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 24.940524
Total Qty 14.857125 145.320682722 28.340721155 8.25528 12765.98785 7.0323687 10.54855305 0.6410672771325 0.011327251595 0.5898775428375 0.08265229425 18.606 54.089 1.704645 37.1139375 3.9459375 24.940524
Rate Per Unit 40.25 0 560.25 156.5 0.04025 156.5 156.5 0 0 0 0 0 0 0 0 0 0
Total Amount 597.99928125 0 15877.889027089 1291.95132 513.8310109625 1100.56570155 1650.848552325 0 0 0 0 0 0 0 0 0 0
Total Royalty Amount (in Rs.): 21033.084893176
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ 1% Rs. 8358.9176595002
2 Display Citizen Board @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 10358.9176595
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 846250.68360952