| State: Odisha |
District: Cuttack |
Block: Baranga |
Gram Panchayat: Dadhapatna |
Work Code: OD/350/3336/116936/907103/00016935 (Maint. & Imp. of Road with CC/ Gr-II Metalling from Station Bazar Level Crossing to Kanak Durga Temple)
Project Category: Road
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Baranga |
Proposal Date: - |
| Date of Commencement: 05-06-2025 |
Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Maintenance and improvement of Road infrastructure |
| Project Sub-Category: Mettalling Road |
Project Type: Repair and Maintenance |
| Name of Executant: Santosh Kumar Patra |
|
Administrative Approval Details
Approval No.: OD/350/3336/116936/907103/00016935/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3336/116936/907103/00016935/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 186532
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
23.099712768 |
7484.88570122 |
172898.70979949 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
12.63109188 |
216.23489289764 |
2731.2827998521 |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
1.3592064 |
5955.08241806 |
8094.1861351546 |
Total Amount (in Rs.): 183724.1787345
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| 462 |
562 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
23.099712768 |
Cubic Meter |
4.6 |
106.2586787328 |
- |
- |
0.68 |
15.70780468224 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
12.63109188 |
Square Meter |
- |
- |
0.05 |
0.631554594 |
0.05 |
0.631554594 |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
1.3592064 |
Cubic Meter |
3.9 |
5.30090496 |
- |
- |
0.18 |
0.244657152 |
| Total Qty |
111.5595836928 |
16.58401642824 |
0.631554594 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
51540.527666074 |
9320.2172326709 |
323.355952128 |
Total Labour Amount (in Rs.): 61184.100850872
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM056 |
BRM104 |
BRM092 |
BRM044 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
23.099712768 |
Cum |
3.23 |
74.61207224064 |
0.45 |
10.3948707456 |
0.9 |
20.7897414912 |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
12.63109188 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0337250153196 |
0.126 |
1.59151757688 |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.3592064 |
Cum |
2.29 |
3.112582656 |
0.48 |
0.652419072 |
- |
- |
- |
- |
- |
- |
0.96 |
1.304838144 |
| Total Qty |
77.72465489664 |
11.0472898176 |
20.7897414912 |
0.0337250153196 |
1.59151757688 |
1.304838144 |
| Rate Per Unit |
563.767 |
417.99 |
2319.71 |
58573.086 |
229.106 |
1891.11 |
| Total Amount |
43818.595517114 |
4617.6566708586 |
48226.171234552 |
1975.3782226662 |
364.62622596867 |
2467.5924624998 |
Total Material Amount (in Rs.): 101470.02033366
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM056 |
BRM104 |
BRM092 |
BRM044 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
23.099712768 |
Cum |
3.23 |
74.61207224064 |
0.45 |
10.3948707456 |
0.9 |
20.7897414912 |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
12.63109188 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0337250153196 |
0.000614 |
0.00775549041432 |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.3592064 |
Cum |
2.29 |
3.112582656 |
0.48 |
0.652419072 |
- |
- |
- |
- |
- |
- |
0.96 |
1.304838144 |
| Total Qty |
77.72465489664 |
11.0472898176 |
20.7897414912 |
0.0337250153196 |
0.00775549041432 |
1.304838144 |
| Rate Per Unit |
0 |
190.25 |
259.5 |
0 |
0 |
259.5 |
| Total Amount |
0 |
2101.7468877984 |
5394.9379169664 |
0 |
0 |
338.605498368 |
Total Royalty Amount (in Rs.): 7835.2903031328
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
1%
|
Rs. 1837.241787345 |
| 2 |
Display Citizen Board @
Rs. 500
|
Rs. 500 |
| 3 |
Any Other Lumpsum @
Rs. 470
|
Rs. 470 |
Total Addition Component Amount (in Rs.): 2807.241787345
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 186531.42052184