| State: Odisha |
District: Ganjam |
Block: Polosara |
Gram Panchayat: Banthapalli |
Work Code: OD/354/3380/117899/411493/00017556 (Repair and Maintenance of Primary School of K Muktamaladeipur PS)
Project Category: Building
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Polosara |
Proposal Date: 03-12-2024 |
| Date of Commencement: 14-11-2025 |
Date of Completion: 19-11-2025 |
| Scheme Name: Asset Management School and Mass Education Department |
Scheme Component Name: Self/Personal Deposit |
| Project Sub-Category: Elementary School |
Project Type: Repair and Maintenance |
| Name of Executant: Subhasmita Patro |
|
Administrative Approval Details
Approval No.: OD/354/3380/117899/411493/00017556/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3380/117899/411493/00017556/TS
Fund Sanction No.: 11572
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
miscellaneous (ARM122) : Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge.
|
Sqm |
224.174939 |
5.12 |
1147.77568768 |
| 2 |
Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge.
|
Sqm |
332.778546 |
79.21834 |
26362.164001734 |
| 3 |
miscellaneous (ARM287) : Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge.
|
Sqm |
7.6644975 |
621.7266 |
4765.2219713835 |
| 4 |
Painting (AR0901di) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
Sqm |
624.1595152 |
72.855030353548 |
45473.160425352 |
| 5 |
Painting (AR0920k) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance)
|
Sqm |
273.227723 |
96.02497735 |
26236.685912467 |
| 6 |
Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside)
|
Sqm |
350.9317922 |
87.87319665 |
30837.498386728 |
Total Amount (in Rs.): 134822.50638534
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Highly-Skilled
|
| 462 |
562 |
612 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 2 |
Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge.
|
332.778546 |
Square Meter |
0.057 |
18.968377122 |
0.05 |
16.6389273 |
- |
- |
| 4 |
Painting (AR0901di) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
624.1595152 |
Square Meter |
0.053763440860215 |
33.556963182796 |
- |
- |
0.053763440860215 |
33.556963182796 |
| 5 |
Painting (AR0920k) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance)
|
273.227723 |
Square Meter |
0.06528 |
17.83630575744 |
- |
- |
0.05508 |
15.04938298284 |
| 6 |
Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside)
|
350.9317922 |
Square Meter |
0.064 |
22.4596347008 |
- |
- |
0.054 |
18.9503167788 |
| Total Qty |
92.821280763036 |
16.6389273 |
67.556662944436 |
| Rate Per Man Day |
462 |
562 |
612 |
| Total Amount |
42883.431712522 |
9351.0771426 |
41344.677721995 |
Total Labour Amount (in Rs.): 93579.186577117
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRMM122 |
BRMMR0038 |
BRM029 |
BRMM287 |
BRM253 |
BRM140 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. |
224.174939 |
Sqm |
1 |
224.174939 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. |
332.778546 |
Sqm |
- |
- |
0.8 |
266.2228368 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
miscellaneous(ARM287) :.Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. |
7.6644975 |
Sqm |
- |
- |
- |
- |
0.03 |
0.229934925 |
1 |
7.6644975 |
- |
- |
- |
- |
- |
- |
| 4 |
Painting(AR0901di) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
624.1595152 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
56.375698147097 |
- |
- |
- |
- |
| 5 |
Painting(AR0920k) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) |
273.227723 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
34.153465375 |
- |
- |
| 6 |
Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
350.9317922 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
43.866474025 |
| Total Qty |
224.174939 |
266.2228368 |
0.229934925 |
7.6644975 |
56.375698147097 |
34.153465375 |
43.866474025 |
| Rate Per Unit |
5.12 |
30 |
403.97 |
608.4 |
159.33732 |
249.64732 |
195.09732 |
| Total Amount |
1147.77568768 |
7986.685104 |
92.88681165225 |
4663.080279 |
8982.7526558874 |
8526.3210995815 |
8558.2315201271 |
Total Material Amount (in Rs.): 39957.733157928
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM253 |
BRM140 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. |
224.174939 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. |
332.778546 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
miscellaneous(ARM287) :.Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. |
7.6644975 |
Sqm |
0.03 |
0.229934925 |
- |
- |
- |
- |
- |
- |
| 4 |
Painting(AR0901di) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
624.1595152 |
Sqm |
- |
- |
0.090322580645161 |
56.375698147097 |
- |
- |
- |
- |
| 5 |
Painting(AR0920k) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside)(For Repair and maintenance) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) |
273.227723 |
Sqm |
- |
- |
- |
- |
0.125 |
34.153465375 |
- |
- |
| 6 |
Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
350.9317922 |
Sqm |
- |
- |
- |
- |
- |
- |
0.125 |
43.866474025 |
| Total Qty |
0.229934925 |
56.375698147097 |
34.153465375 |
43.866474025 |
| Rate Per Unit |
40.25 |
0 |
0 |
0 |
| Total Amount |
9.25488073125 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 9.25488073125
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for PH Work @
Rs. 8000
|
Rs. 8000 |
| 2 |
Provision for Contingency @
Rs. 1500
|
Rs. 1500 |
| 3 |
Display Citizen Board @
Rs. 677.49
|
Rs. 677.49 |
| 4 |
Any Other Lumpsum @
Rs. 1500
|
Rs. 1500 |
Total Addition Component Amount (in Rs.): 11677.49
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 146499.99638534