State: Odisha District: Kandhamal Block: G.Udayagiri Gram Panchayat: Talarimaha
Work Code: OD/359/3425/118921/416000/00023412 (Construction Of Guard Wall At Balumaha Sugamaha Bridge)
Project Category: Water Body
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, G.Udayagiri Proposal Date: -
Date of Commencement: 07-11-2025 Date of Completion: 13-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: Guard Wall or Retaining Wall or Protection Wall Project Type: New Work
Name of Executant: PRAMOD KUMAR NAYAK
Administrative Approval Details
Approval No.: OD/359/3425/118921/416000/00023412/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3425/118921/416000/00023412/TS
Fund Sanction No.: 1473
Fund Sanction Amount (in Rs.): 214341
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : First floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 23.19447777088 8046.8181468 186641.74463227
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 116.31827212 216.23489289764 25152.069113907
Total Amount (in Rs.): 211793.81374617
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : First floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.19447777088 Cubic Meter 5.29 122.69878740796 - - 0.782 18.138081616828
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 116.31827212 Square Meter - - 0.05 5.815913606 0.05 5.815913606
Total Qty 122.69878740796 23.953995222828 5.815913606
Rate Per Man Day 462 562 512
Total Amount 56686.839782475 13462.145315229 2977.747766272
Total Labour Amount (in Rs.): 73126.732863977
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.First floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.19447777088 Cum 3.23 74.918163199942 0.45 10.437514996896 0.9 20.875029993792 - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 116.31827212 Sqm - - - - - - 0.00267 0.3105697865604 0.126 14.65610228712
Total Qty 74.918163199942 10.437514996896 20.875029993792 0.3105697865604 14.65610228712
Rate Per Unit 587.312 1168.79 2442.53 58573.086 229.106
Total Amount 44000.336265285 12199.263153222 50987.887010737 18191.030817204 3357.8009705929
Total Material Amount (in Rs.): 128736.31821704
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.First floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.19447777088 Cum 3.23 74.918163199942 0.45 10.437514996896 0.9 20.875029993792 - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 116.31827212 Sqm - - - - - - 0.00267 0.3105697865604 0.000614 0.07141941908168
Total Qty 74.918163199942 10.437514996896 20.875029993792 0.3105697865604 0.07141941908168
Rate Per Unit 0 40.25 149.5 0 0
Total Amount 0 420.10997862506 3120.8169840719 0 0
Total Royalty Amount (in Rs.): 3540.926962697
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 404 Rs. 404
2 Provision for Contingency @ Rs. 2143 Rs. 2143
Total Addition Component Amount (in Rs.): 2547
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 214340.81374617