State: Odisha District: Khordha Block: Khordha Gram Panchayat: Barasahi
Work Code: OD/362/3464/275250/407308/00032314 (Const Of Metal Morrum Road From Prafful Samantaray House To Nityananda Sundaray House,Kumbhilo)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Khordha Proposal Date: -
Date of Commencement: 15-09-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Mettalling Road Project Type: New Work
Name of Executant: SUBHASMITA SAHOO
Administrative Approval Details
Approval No.: OD/362/3464/275250/407308/00032314/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3464/275250/407308/00032314/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 300000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. Sqm 989.41695 4.6662 4616.81737209
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. Cum 100.52464 1414.1884233516 142160.78214959
3 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. Sqm 659.6113 6.9683158064516 4596.3798479041
4 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). Cum 66.3462624 1794.7279921361 119073.49430289
5 Earth Work (AR0122Bii) : Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. Cum 30.157392 361.33930892 10897.05118411
6 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. Cum 100.52464 116.655 11726.7018792
Total Amount (in Rs.): 293071.22673578
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 989.41695 Square Meter 0.01 9.8941695 - - - -
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 100.52464 Cubic Meter 1.1333922261484 113.93384551237 - - - -
3 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 659.6113 Square Meter 0.0032258064516129 2.1277783870968 - - - -
4 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 66.3462624 Cubic Meter 0.69444444444444 46.073793333333 0.028 1.8576953472 0.0055555555555556 0.36859034666667
5 Earth Work (AR0122Bii) : Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. 30.157392 Cubic Meter 0.43 12.96767856 - - - -
6 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 100.52464 Cubic Meter 0.25 25.13116 - - - -
Total Qty 210.1284252928 0.36859034666667 1.8576953472
Rate Per Man Day 462 562 512
Total Amount 97079.332485272 207.14777482667 951.1400177664
Total Labour Amount (in Rs.): 98237.620277866
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029 BRMMR0037 BRM076 BRM026 BRMM402 BRMM401
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 989.41695 Sqm - - - - - - - - - - - - - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 100.52464 Cum 0.89578798586572 90.048764795477 0.384 38.60146176 - - - - - - - - - -
3 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 659.6113 Sqm - - 0.006 3.9576678 - - - - - - - - - -
4 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 66.3462624 Cum - - - - 0.4 26.53850496 1.21 80.278977504 0.34669444444444 23.001880583733 - - - -
5 Earth Work (AR0122Bii) :.Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. 30.157392 Cum - - - - - - - - - - -0.6666 -20.1029175072 1 30.157392
6 Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 100.52464 Cum - - - - - - - - - - - - - -
Total Qty 90.048764795477 42.55912956 26.53850496 80.278977504 23.001880583733 -20.1029175072 30.157392
Rate Per Unit 532.56 853 10 867.3 672.74 175.38 276.01
Total Amount 47956.370179479 36302.93751468 265.3850496 69625.957189219 15474.285143901 -3525.6496724127 8323.74176592
Total Material Amount (in Rs.): 174423.02717039
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029 BRM026
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 989.41695 Sqm - - - - - -
2 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 100.52464 Cum 0.89578798586572 90.048764795477 0.384 38.60146176 - -
3 Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 659.6113 Sqm - - 0.006 3.9576678 - -
4 Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 66.3462624 Cum - - - - 0.34669444444444 23.001880583733
5 Earth Work (AR0122Bii) :.Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. 30.157392 Cum - - - - - -
6 Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 100.52464 Cum - - - - - -
Total Qty 90.048764795477 42.55912956 23.001880583733
Rate Per Unit 48.5 48.5 214.75
Total Amount 4367.3650925806 2064.11778366 4939.6538553567
Total Royalty Amount (in Rs.): 11371.136731597
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ 1% Rs. 2930.7122673578
2 Display Citizen Board @ Rs. 2000 Rs. 2000
3 Any Other Lumpsum @ Rs. 1998 Rs. 1998
Total Addition Component Amount (in Rs.): 6928.7122673578
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 299999.93900314