State: Odisha District: Gajapati Block: Nuagada Gram Panchayat: Luhangar
Work Code: OD/353/3361/117527/414202/00039200 (Improvement of road from Tarmangada to udasing via Muri)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Nuagada Proposal Date: -
Date of Commencement: 23-07-2025 Date of Completion: 31-07-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Amit Digal
Administrative Approval Details
Approval No.: OD/353/3361/117527/414202/00039200/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3361/117527/414202/00039200/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0103a) : Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department Cum 13.7193 312.915372 4292.9798630796
2 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 9.8868 6146.4422943 60768.645675285
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 7.665 8509.2597061 65223.475647256
4 R.C.C. Work (AR0410L) : Rigid and smooth centering and shuttering for R.C.C. works (R.C.C. beams for bridges upto 15m span and height upto 5m) - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor (R.C.C. beams for bridges upto 15m span and height upto 5m) Sqm 12.6 1309.488625768 16499.556684677
Total Amount (in Rs.): 146784.6578703
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) : Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 13.7193 Cubic Meter 0.6706 9.20016258 - - - -
2 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.8868 Cubic Meter 3.9 38.55852 - - 0.18 1.779624
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.665 Cubic Meter 4.6 35.259 - - 0.68 5.2122
4 R.C.C. Work (AR0410L) : Rigid and smooth centering and shuttering for R.C.C. works (R.C.C. beams for bridges upto 15m span and height upto 5m) - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor (R.C.C. beams for bridges upto 15m span and height upto 5m) 12.6 Square Meter - - 0.81845238095238 10.3125 0.81845238095238 10.3125
Total Qty 83.01768258 17.304324 10.3125
Rate Per Man Day 462 562 512
Total Amount 38354.16935196 9725.030088 5280
Total Labour Amount (in Rs.): 53359.19943996
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM084
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 13.7193 Cum - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.8868 Cum 2.29 22.640772 0.48 4.745664 0.96 9.491328 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.665 Cum 3.23 24.75795 0.45 3.44925 - - 0.9 6.8985 - - - -
4 R.C.C. Work (AR0410L) :.Rigid and smooth centering and shuttering for R.C.C. works (R.C.C. beams for bridges upto 15m span and height upto 5m) - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor (R.C.C. beams for bridges upto 15m span and height upto 5m) 12.6 Sqm - - - - - - - - 0.0064880952380952 0.08175 0.69047619047619 8.7
Total Qty 47.398722 8.194914 9.491328 6.8985 0.08175 8.7
Rate Per Unit 801.567 808.59 1128.47 2128.33 58592.11 269.19
Total Amount 37993.251397374 6626.32551126 10710.67890816 14682.284505 4789.9049925 2341.953
Total Material Amount (in Rs.): 77144.398314294
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM084
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 13.7193 Cum - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.8868 Cum 2.29 22.640772 0.48 4.745664 0.96 9.491328 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.665 Cum 3.23 24.75795 0.45 3.44925 - - 0.9 6.8985 - - - -
4 R.C.C. Work (AR0410L) :.Rigid and smooth centering and shuttering for R.C.C. works (R.C.C. beams for bridges upto 15m span and height upto 5m) - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor (R.C.C. beams for bridges upto 15m span and height upto 5m) 12.6 Sqm - - - - - - - - 0.0064880952380952 0.08175 0.0070833095238095 0.0892497
Total Qty 47.398722 8.194914 9.491328 6.8985 0.08175 0.0892497
Rate Per Unit 0 279.25 269.5 269.5 0 0
Total Amount 0 2288.4297345 2557.912896 1859.14575 0 0
Total Royalty Amount (in Rs.): 6705.4883805
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ 1% Rs. 1467.846578703
2 Display Citizen Board @ Rs. 300 Rs. 300
3 Any Other Lumpsum @ Rs. 947 Rs. 947
4 Provision for survey investigation and quality control @ Rs. 500 Rs. 500
Total Addition Component Amount (in Rs.): 3214.846578703
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 149999.504449