| State: Odisha |
District: Jagatsinghpur |
Block: Tirtol |
Gram Panchayat: Tulanga |
Work Code: OD/355/3393/118234/397779/00040193 (REPAIRING OF CC ROAD FROM TAMAPADA BASANTA SWAIN HOUSE TO SAHANI THAKURANI TEMPLE, VILLAGE TAMAPADA.)
Project Category: Road
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Tirtol |
Proposal Date: 07-12-2024 |
| Date of Commencement: 18-10-2025 |
Date of Completion: 02-12-2025 |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: All Weather Connectivity |
| Project Sub-Category: CC Road |
Project Type: Repair and Maintenance |
| Name of Executant: MONALISA MALLICK |
|
Administrative Approval Details
Approval No.: OD/355/3393/118234/397779/00040193/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118234/397779/00040193/TS
Fund Sanction No.: 30636
Fund Sanction Amount (in Rs.): 143788
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
1.344 |
6923.09431628 |
9304.6387610803 |
| 2 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
14.87808 |
8681.27555936 |
129160.7122742 |
| 3 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
6.72 |
216.39264180804 |
1454.15855295 |
Total Amount (in Rs.): 139919.50958823
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| 462 |
562 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
1.344 |
Cubic Meter |
3.9 |
5.2416 |
- |
- |
0.18 |
0.24192 |
| 2 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
14.87808 |
Cubic Meter |
4.6 |
68.439168 |
- |
- |
0.68 |
10.1170944 |
| 3 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
6.72 |
Square Meter |
- |
- |
0.05 |
0.336 |
0.05 |
0.336 |
| Total Qty |
73.680768 |
10.6950144 |
0.336 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
34040.514816 |
6010.5980928 |
172.032 |
Total Labour Amount (in Rs.): 40223.1449088
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM045 |
BRM056 |
BRM104 |
BRM092 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.344 |
Cum |
2.29 |
3.07776 |
0.48 |
0.64512 |
0.96 |
1.29024 |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
14.87808 |
Cum |
3.23 |
48.0561984 |
0.45 |
6.695136 |
- |
- |
0.9 |
13.390272 |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
6.72 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0179424 |
0.126 |
0.84672 |
| Total Qty |
51.1339584 |
7.340256 |
1.29024 |
13.390272 |
0.0179424 |
0.84672 |
| Rate Per Unit |
631.162 |
738.32 |
2345.94 |
2994.53 |
58620.646 |
276.666 |
| Total Amount |
32273.811451661 |
5419.45780992 |
3026.8256256 |
40097.57121216 |
1051.7950787904 |
234.25863552 |
Total Material Amount (in Rs.): 82103.719813651
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM045 |
BRM056 |
BRM104 |
BRM092 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
1.344 |
Cum |
2.29 |
3.07776 |
0.48 |
0.64512 |
0.96 |
1.29024 |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
14.87808 |
Cum |
3.23 |
48.0561984 |
0.45 |
6.695136 |
- |
- |
0.9 |
13.390272 |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
6.72 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0179424 |
0.000614 |
0.00412608 |
| Total Qty |
51.1339584 |
7.340256 |
1.29024 |
13.390272 |
0.0179424 |
0.00412608 |
| Rate Per Unit |
0 |
199.25 |
444.5 |
444.5 |
0 |
0 |
| Total Amount |
0 |
1462.546008 |
573.51168 |
5951.975904 |
0 |
0 |
Total Royalty Amount (in Rs.): 7988.033592
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
1%
|
Rs. 1399.1950958823 |
| 2 |
Display Citizen Board @
Rs. 1070
|
Rs. 1070 |
| 3 |
Any Other Lumpsum @
1%
|
Rs. 1399.1950958823 |
Total Addition Component Amount (in Rs.): 3868.3901917646
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 143787.89978