| State: Odisha |
District: Koraput |
Block: Pottangi |
Gram Panchayat: Deopattangi |
Work Code: OD/363/3478/119901/430050/00043031 (Repair and maintenance of UP School Salapguda)
Project Category: Building
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Pottangi |
Proposal Date: 16-07-2024 |
| Date of Commencement: 20-01-2026 |
Date of Completion: - |
| Scheme Name: SFC Devolution of Fund |
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI |
| Project Sub-Category: Elementary School |
Project Type: Repair and Maintenance |
| Name of Executant: PRASANNA GARADA |
|
Administrative Approval Details
Approval No.: OD/363/3478/119901/430050/00043031/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3478/119901/430050/00043031/TS
Fund Sanction No.: 15384
Fund Sanction Amount (in Rs.): 100000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Dismantling (AR1620) : Dismantling and removing 2.5 cm thick grading concrete from roof - Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
Sqm |
84 |
112.89193548387 |
9482.9225806451 |
| 2 |
Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work)
|
Sqm |
84 |
387.142745086 |
32519.990587224 |
| 3 |
Dismantling (AR1613) : Fifth Floor - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
Sqm |
28.8 |
64.036398139113 |
1844.2482664065 |
| 4 |
Other Building Items. (AR1902) : First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge.
|
Sqm |
68.07 |
80.8676902 |
5504.663671914 |
| 5 |
Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
Sqm |
167.4675 |
71.84762054351 |
12032.14139337 |
| 6 |
Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)
|
Sqm |
168 |
96.672410075 |
16240.9648926 |
| 7 |
Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
Sqm |
115.56 |
160.75408487694 |
18576.742048379 |
Total Amount (in Rs.): 96201.673440539
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Highly-Skilled
|
Skilled
|
| 462 |
612 |
562 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1620) : Dismantling and removing 2.5 cm thick grading concrete from roof - Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
84 |
Square Meter |
0.24193548387097 |
20.322580645161 |
- |
- |
- |
- |
| 2 |
Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work)
|
84 |
Square Meter |
0.414 |
34.776 |
- |
- |
0.115 |
9.66 |
| 3 |
Dismantling (AR1613) : Fifth Floor - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
28.8 |
Square Meter |
0.1372345766129 |
3.9523558064516 |
- |
- |
- |
- |
| 4 |
Other Building Items. (AR1902) : First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge.
|
68.07 |
Square Meter |
0.05871 |
3.9963897 |
0.0515 |
3.505605 |
- |
- |
| 5 |
Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
167.4675 |
Square Meter |
0.053763440860215 |
9.0036290322581 |
- |
- |
0.053763440860215 |
9.0036290322581 |
| 6 |
Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)
|
168 |
Square Meter |
0.06592 |
11.07456 |
- |
- |
0.05562 |
9.34416 |
| 7 |
Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
115.56 |
Square Meter |
0.11776344086022 |
13.608743225806 |
- |
- |
0.10776344086022 |
12.453143225806 |
| Total Qty |
96.734258409677 |
40.460932258065 |
3.505605 |
| Rate Per Man Day |
462 |
612 |
562 |
| Total Amount |
44691.227385271 |
24762.090541935 |
1970.15001 |
Total Labour Amount (in Rs.): 71423.467937206
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM064 |
BRMMR0038 |
BRM253 |
BRM140 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1620) :.Dismantling and removing 2.5 cm thick grading concrete from roof - Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
84 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) |
84 |
Sqm |
0.1208 |
10.1472 |
0.0169 |
1.4196 |
0.0169 |
1.4196 |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Dismantling (AR1613) :.Fifth Floor - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
28.8 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Other Building Items. (AR1902) :.First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. |
68.07 |
Sqm |
- |
- |
- |
- |
- |
- |
0.8 |
54.456 |
- |
- |
- |
- |
- |
- |
| 5 |
Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
167.4675 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
14.06727 |
- |
- |
- |
- |
| 6 |
Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) |
168 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
21 |
- |
- |
| 7 |
Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
115.56 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
10.437677419355 |
- |
- |
0.125 |
14.445 |
| Total Qty |
10.1472 |
1.4196 |
1.4196 |
54.456 |
24.504947419355 |
21 |
14.445 |
| Rate Per Unit |
584.177 |
807.57 |
1321.51 |
30 |
159.45622 |
249.76622 |
195.21622 |
| Total Amount |
5927.7608544 |
1146.426372 |
1876.015596 |
1633.68 |
3907.4662867891 |
5245.09062 |
2819.8982979 |
Total Material Amount (in Rs.): 22556.338027089
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM064 |
BRM253 |
BRM140 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1620) :.Dismantling and removing 2.5 cm thick grading concrete from roof - Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
84 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) |
84 |
Sqm |
0.1208 |
10.1472 |
0.0169 |
1.4196 |
0.0169 |
1.4196 |
- |
- |
- |
- |
- |
- |
| 3 |
Dismantling (AR1613) :.Fifth Floor - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
28.8 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Other Building Items. (AR1902) :.First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. |
68.07 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
167.4675 |
Sqm |
- |
- |
- |
- |
- |
- |
0.084 |
14.06727 |
- |
- |
- |
- |
| 6 |
Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) |
168 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
21 |
- |
- |
| 7 |
Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
115.56 |
Sqm |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
10.437677419355 |
- |
- |
0.125 |
14.445 |
| Total Qty |
10.1472 |
1.4196 |
1.4196 |
24.504947419355 |
21 |
14.445 |
| Rate Per Unit |
0 |
40.25 |
149.5 |
0 |
0 |
0 |
| Total Amount |
0 |
57.1389 |
212.2302 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 269.3691
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
Rs. 1000
|
Rs. 1000 |
| 2 |
Display Citizen Board @
Rs. 2000
|
Rs. 2000 |
| 3 |
Any Other Lumpsum @
Rs. 798
|
Rs. 798 |
Total Addition Component Amount (in Rs.): 3798
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 99999.673440539