State: Odisha District: Mayurbhanj Block: Betnoti Gram Panchayat: Mahisasole
Work Code: OD/365/3491/120118/390439/00050094 (Renovation and Beautification of Shikarkhunta gudi Pokhari at Sikarkhunta )
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Betnoti Proposal Date: -
Date of Commencement: 23-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: Renovation or Rejuvenation
Name of Executant: PRASANTA KUMAR BEHERA
Administrative Approval Details
Approval No.: OD/365/3491/120118/390439/00050094/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3491/120118/390439/00050094/TS
Fund Sanction No.: 33742
Fund Sanction Amount (in Rs.): 400000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Special items for irrigation works (AR0216) : Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. Cum 5385 67.165 361683.525
2 Earth Work (AR0108) : extra lift of 1.5m to 3.0m - Extra lift of 1.5m or part thereof over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earthwork in general.(1st extra lift of 1.5m to 3.0m) Cum 1470 19.13142 28123.1874
Total Amount (in Rs.): 389806.7124
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled
462
Qty/Unit (B) Total Qty (A*B)
2 Earth Work (AR0108) : extra lift of 1.5m to 3.0m - Extra lift of 1.5m or part thereof over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earthwork in general.(1st extra lift of 1.5m to 3.0m) 1470 Cubic Meter 0.041 60.27
Total Qty 60.27
Rate Per Man Day 462
Total Amount 27844.74
Total Labour Amount (in Rs.): 27844.74
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0065 BRMMR0102 BRMMR0104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0216) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. 5385 Cum 1 5385 1 5385 1 5385
2 Earth Work (AR0108) :.extra lift of 1.5m to 3.0m - Extra lift of 1.5m or part thereof over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earthwork in general.(1st extra lift of 1.5m to 3.0m) 1470 Cum - - - - - -
Total Qty 5385 5385 5385
Rate Per Unit 1 25.01 40.49
Total Amount 5385 134678.85 218038.65
Total Material Amount (in Rs.): 358102.5
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 3500 Rs. 3500
2 Any Other Lumpsum @ Rs. 2795.22 Rs. 2795.22
3 Provision for Contingency @ 1% Rs. 3898.067124
Total Addition Component Amount (in Rs.): 10193.287124
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 399999.999524