| State: Odisha |
District: Balasore |
Block: Bhograi |
Gram Panchayat: Pasarbindha |
Work Code: OD/346/3302/275569/391755/00050772 (CONST OF MARKET COMPLEX AT AUSA CHHAK)
Project Category: Building
| Financial Year: 2022-23 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bhograi |
Proposal Date: - |
| Date of Commencement: 09-09-2025 |
Date of Completion: 11-09-2025 |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Creation of Capital Asset for Revenue Generation |
| Project Sub-Category: Market Complex |
Project Type: New Work |
| Name of Executant: SOUMITA MOHANTY |
|
Administrative Approval Details
Approval No.: OD/346/3302/275569/391755/00050772/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3302/275569/391755/00050772/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
92.3764808 |
1216.164432 |
112344.99030229 |
| 2 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
5.540819048 |
7187.81256504 |
39826.368773827 |
| 3 |
R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.)
|
Cum |
1.6093640904 |
7645.8957366729 |
12305.030037544 |
| 4 |
R.C.C. Work (AR0404Ab) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band)
|
Cum |
11.081638096 |
8403.269983001 |
93121.996774597 |
| 5 |
R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade)
|
Cum |
21.672121296 |
13953.63809209 |
302404.93725226 |
| 6 |
R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge.
|
Qntl |
34.32 |
8932.3929845 |
306559.72722804 |
| 7 |
Pile Foundation (AR1501cd) : Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips - Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M-20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel including cost, convenience, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (250mm dia and 4.5 meter long)
|
Nos |
33 |
3588.705970684 |
118427.29703257 |
Total Amount (in Rs.): 984990.34740113
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
Highly-Skilled
|
| 462 |
562 |
512 |
612 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
92.3764808 |
Cubic Meter |
0.1236 |
11.41773302688 |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
5.540819048 |
Cubic Meter |
3.9 |
21.6091942872 |
- |
- |
0.18 |
0.99734742864 |
- |
- |
| 3 |
R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.)
|
1.6093640904 |
Cubic Meter |
1.3333 |
2.1457651417303 |
0.1323 |
0.21291886915992 |
0.175 |
0.28163871582 |
- |
- |
| 4 |
R.C.C. Work (AR0404Ab) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band)
|
11.081638096 |
Cubic Meter |
1.3333 |
14.775148073397 |
0.3073 |
3.4053873869008 |
0.35 |
3.8785733336 |
- |
- |
| 5 |
R.C.C. Work (AR0404Ag) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade)
|
21.672121296 |
Cubic Meter |
1.3333 |
28.895439323957 |
3.11255 |
67.455561139865 |
3.15525 |
68.380960719204 |
- |
- |
| 6 |
R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge.
|
34.32 |
Quintal |
0.8 |
27.456 |
0.044 |
1.51008 |
- |
- |
0.3 |
10.296 |
| 7 |
Pile Foundation (AR1501cd) : Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips - Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M-20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel including cost, convenience, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (250mm dia and 4.5 meter long)
|
33 |
Number |
0.381 |
12.573 |
0.021 |
0.693 |
0.028 |
0.924 |
1.625 |
53.625 |
| Total Qty |
118.87227985316 |
74.462520197264 |
73.276947395926 |
63.921 |
| Rate Per Man Day |
462 |
562 |
512 |
612 |
| Total Amount |
54918.993292162 |
41847.936350862 |
37517.797066714 |
39119.652 |
Total Labour Amount (in Rs.): 173404.37870974
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM060 |
BRM052 |
BRM104 |
BRM092 |
BRM084 |
BRM162 |
BRM341 |
BRM178 |
BRM342 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
92.3764808 |
Cum |
1 |
92.3764808 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
5.540819048 |
Cum |
- |
- |
2.29 |
12.68847561992 |
0.48 |
2.65959314304 |
0.96 |
5.31918628608 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) |
1.6093640904 |
Cum |
- |
- |
3.4733 |
5.5898042951863 |
0.45 |
0.72421384068 |
- |
- |
0.36 |
0.579371072544 |
0.54 |
0.869056608816 |
0.004005 |
0.006445503182052 |
0.189 |
0.3041698130856 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) |
11.081638096 |
Cum |
- |
- |
3.4733 |
38.489853598837 |
0.45 |
4.9867371432 |
- |
- |
0.36 |
3.98938971456 |
0.54 |
5.98408457184 |
0.01335 |
0.1479398685816 |
0.63 |
6.98143200048 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) |
21.672121296 |
Cum |
- |
- |
3.4733 |
75.273778897397 |
0.45 |
9.7524545832 |
- |
- |
0.36 |
7.80196366656 |
0.54 |
11.70294549984 |
0.0502172 |
1.0883132495455 |
- |
- |
6.2216 |
134.83526985519 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. |
34.32 |
Qntl |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.8 |
27.456 |
1.05 |
36.036 |
- |
- |
- |
- |
- |
- |
| 7 |
Pile Foundation(AR1501cd) :.Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips - Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M-20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel including cost, convenience, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (250mm dia and 4.5 meter long) |
33 |
Nos |
- |
- |
1.084 |
35.772 |
0.129 |
4.257 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.813 |
26.829 |
0.325 |
10.725 |
0.257 |
8.481 |
| Total Qty |
92.3764808 |
167.81391241134 |
22.37999871012 |
5.31918628608 |
12.370724453664 |
18.556086680496 |
1.2426986213091 |
7.2856018135656 |
134.83526985519 |
27.456 |
36.036 |
26.829 |
10.725 |
8.481 |
| Rate Per Unit |
881.77 |
552.252 |
886.71 |
2666.76 |
3090.18 |
3053.8 |
58620.646 |
276.666 |
297.726 |
90 |
6619.882 |
337.87 |
450 |
3068.13 |
| Total Amount |
81454.809475016 |
92675.568756987 |
19844.568656251 |
14184.993220267 |
38227.765292223 |
56666.577504899 |
72847.795964451 |
2015.6783113519 |
40143.965552907 |
2471.04 |
238554.067752 |
9064.71423 |
4826.25 |
26020.81053 |
Total Material Amount (in Rs.): 698998.60524635
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM060 |
BRM052 |
BRM104 |
BRM092 |
BRM084 |
BRM341 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
92.3764808 |
Cum |
1 |
92.3764808 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
5.540819048 |
Cum |
- |
- |
2.29 |
12.68847561992 |
0.48 |
2.65959314304 |
0.96 |
5.31918628608 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) |
1.6093640904 |
Cum |
- |
- |
3.4733 |
5.5898042951863 |
0.45 |
0.72421384068 |
- |
- |
0.36 |
0.579371072544 |
0.54 |
0.869056608816 |
0.004005 |
0.006445503182052 |
0.000921 |
0.0014822243272584 |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) |
11.081638096 |
Cum |
- |
- |
3.4733 |
38.489853598837 |
0.45 |
4.9867371432 |
- |
- |
0.36 |
3.98938971456 |
0.54 |
5.98408457184 |
0.01335 |
0.1479398685816 |
0.00307 |
0.03402062895472 |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) |
21.672121296 |
Cum |
- |
- |
3.4733 |
75.273778897397 |
0.45 |
9.7524545832 |
- |
- |
0.36 |
7.80196366656 |
0.54 |
11.70294549984 |
0.0502172 |
1.0883132495455 |
- |
- |
0.076659 |
1.6613631464301 |
- |
- |
- |
- |
| 6 |
R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. |
34.32 |
Qntl |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1.05 |
36.036 |
- |
- |
| 7 |
Pile Foundation(AR1501cd) :.Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips - Single under reamed pile foundation 250 mm dia and 4.5 metre long with RCC M-20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel including cost, convenience, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (250mm dia and 4.5 meter long) |
33 |
Nos |
- |
- |
1.084 |
35.772 |
0.129 |
4.257 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.257 |
8.481 |
| Total Qty |
92.3764808 |
167.81391241134 |
22.37999871012 |
5.31918628608 |
12.370724453664 |
18.556086680496 |
1.2426986213091 |
0.035502853281978 |
1.6613631464301 |
36.036 |
8.481 |
| Rate Per Unit |
265.25 |
0 |
265.25 |
522.5 |
522.5 |
522.5 |
0 |
0 |
0 |
0 |
522.5 |
| Total Amount |
24502.8615322 |
0 |
5936.2946578593 |
2779.2748344768 |
6463.7035270394 |
9695.5552905592 |
0 |
0 |
0 |
0 |
4431.3225 |
Total Royalty Amount (in Rs.): 53809.012342135
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
Rs. 10000
|
Rs. 10000 |
| 2 |
Display Citizen Board @
Rs. 3000
|
Rs. 3000 |
| 3 |
Any Other Lumpsum @
Rs. 2009
|
Rs. 2009 |
Total Addition Component Amount (in Rs.): 15009
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 999999.34740113