State: Odisha District: Gajapati Block: Mohona Gram Panchayat: Liliguda
Work Code: OD/353/3360/275039/413802/00052763 (Maintainence and Improvement of Road with CC / Grade-2 meatling from Kamiliguda to Badakhani)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Mohona Proposal Date: 31-12-2024
Date of Commencement: 03-02-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Pradeepta Kumar Sethi
Administrative Approval Details
Approval No.: OD/353/3360/275039/413802/00052763/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3360/275039/413802/00052763/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 800000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Special items for irrigation works (AR0216) : Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. Cum 11700 67.165 785830.5
Total Amount (in Rs.): 785830.5
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0065 BRMMR0102 BRMMR0104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0216) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. 11700 Cum 1 11700 1 11700 1 11700
Total Qty 11700 11700 11700
Rate Per Unit 1 25.01 40.49
Total Amount 11700 292617 473733
Total Material Amount (in Rs.): 778050
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ 1% Rs. 7858.305
2 Display Citizen Board @ Rs. 5000 Rs. 5000
Total Addition Component Amount (in Rs.): 12858.305
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 798688.805