State: Odisha District: Balasore Block: Soro Gram Panchayat: Antapur
Work Code: OD/346/3309/116311/393969/00054168 (Repair and Restoration of road from Jogeswari Temple to Parida Sahi Ainiri)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Soro Proposal Date: 22-11-2024
Date of Commencement: 20-09-2025 Date of Completion: 22-09-2025
Scheme Name: Severe Cyclonic Storm DANA 2024 Scheme Component Name: Self/Personal Deposit
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Rojalin Jena
Administrative Approval Details
Approval No.: OD/346/3309/116311/393969/00054168/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3309/116311/393969/00054168/TS
Fund Sanction No.: 27033
Fund Sanction Amount (in Rs.): 30000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 3.7125 7853.15581598 29154.840966826
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 2.7 216.23489289764 583.83421082363
Total Amount (in Rs.): 29738.675177649
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.7125 Cubic Meter 4.6 17.0775 - - 0.68 2.5245
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 2.7 Square Meter - - 0.05 0.135 0.05 0.135
Total Qty 17.0775 2.6595 0.135
Rate Per Man Day 462 562 512
Total Amount 7889.805 1494.639 69.12
Total Labour Amount (in Rs.): 9453.564
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.7125 Cum 3.23 11.991375 0.45 1.670625 0.9 3.34125 - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 2.7 Sqm - - - - - - 0.00267 0.007209 0.126 0.3402
Total Qty 11.991375 1.670625 3.34125 0.007209 0.3402
Rate Per Unit 546.307 984.79 1933.03 58573.086 229.106
Total Amount 6550.972102125 1645.21479375 6458.7364875 422.253376974 77.9418612
Total Material Amount (in Rs.): 15155.118621549
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.7125 Cum 3.23 11.991375 0.45 1.670625 0.9 3.34125 - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 2.7 Sqm - - - - - - 0.00267 0.007209 0.000614 0.0016578
Total Qty 11.991375 1.670625 3.34125 0.007209 0.0016578
Rate Per Unit 0 482.5 702 0 0
Total Amount 0 806.0765625 2345.5575 0 0
Total Royalty Amount (in Rs.): 3151.6340625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ Rs. 61.32 Rs. 61.32
2 Display Citizen Board @ Rs. 200 Rs. 200
Total Addition Component Amount (in Rs.): 261.32
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 29999.995177649