State: Odisha District: Kalahandi Block: Madanpur Rampur Gram Panchayat: Saidalanga
Work Code: OD/358/3419/118822/422639/00055129 (Repair and Maintenance of AAM Turchi. C/R No-03/25-26)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Madanpur Rampur Proposal Date: -
Date of Commencement: 24-10-2025 Date of Completion: -
Scheme Name: Asset Management Health and Family Welfare Department Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Primary Health Centre Project Type: Repair and Maintenance
Name of Executant: JE BEPARI
Administrative Approval Details
Approval No.: OD/358/3419/118822/422639/00055129/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3419/118822/422639/00055129/TS
Fund Sanction No.: 5063/ZP
Fund Sanction Amount (in Rs.): 65000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 268.312 94.76013415 25425.281114055
2 Painting (AR0901d) : Second Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 271.342 75.389181777187 20456.251361785
Total Amount (in Rs.): 45881.53247584
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled
612 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 268.312 Square Meter 0.064 17.171968 0.054 14.488848
2 Painting (AR0901d) : Second Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 271.342 Square Meter 0.057037634408602 15.476705795699 0.057037634408602 15.476705795699
Total Qty 29.965553795699 32.648673795699
Rate Per Man Day 612 462
Total Amount 18338.918922968 15083.687293613
Total Labour Amount (in Rs.): 33422.606216581
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 268.312 Sqm 0.125 33.539 - -
2 Painting(AR0901d) :.Second Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 271.342 Sqm - - 0.084 22.792728
Total Qty 33.539 22.792728
Rate Per Unit 249.64732 159.33732
Total Amount 8372.92146548 3631.732195009
Total Material Amount (in Rs.): 12004.653660489
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 268.312 Sqm 0.125 33.539 - -
2 Painting(AR0901d) :.Second Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 271.342 Sqm - - 0.084 22.792728
Total Qty 33.539 22.792728
Rate Per Unit 0 0
Total Amount 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ 1% Rs. 458.8153247584
2 Display Citizen Board @ Rs. 1500 Rs. 1500
3 Any Other Lumpsum @ Rs. 17150 Rs. 17150
Total Addition Component Amount (in Rs.): 19108.815324758
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 64990.347800599