State: Odisha District: Koraput Block: Boipariguda Gram Panchayat: P Ujariguda
Work Code: OD/363/3467/275126/429224/00055230 (REPAIR & MAINT OF AWC AT BARANGPALLI)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Boipariguda Proposal Date: -
Date of Commencement: 23-09-2025 Date of Completion: -
Scheme Name: Asset Management Women and Child Development Department Scheme Component Name: Self/Personal Deposit
Project Sub-Category: AWC Project Type: Repair and Maintenance
Name of Executant: Umesh
Administrative Approval Details
Approval No.: OD/363/3467/275126/429224/00055230/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3467/275126/429224/00055230/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 263.208 61.22776449 16115.637435884
2 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 31.86 164.21250721452 5231.8104798546
Total Amount (in Rs.): 21347.447915739
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled
462 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 263.208 Square Meter 0.043 11.317944 0.036 9.475488
2 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.86 Square Meter 0.11827956989247 3.7683870967742 0.13440860215054 4.2822580645161
Total Qty 15.086331096774 13.757746064516
Rate Per Man Day 462 612
Total Amount 6969.8849667097 8419.7405914839
Total Labour Amount (in Rs.): 15389.625558194
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 263.208 Sqm 0.075 19.7406 - -
2 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.86 Sqm - - 0.125 3.9825
Total Qty 19.7406 3.9825
Rate Per Unit 249.64732 205.46732
Total Amount 4928.187885192 818.2736019
Total Material Amount (in Rs.): 5746.461487092
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM140 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 263.208 Sqm 0.075 19.7406 - -
2 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 31.86 Sqm - - 0.125 3.9825
Total Qty 19.7406 3.9825
Rate Per Unit 0 0
Total Amount 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ Rs. 450 Rs. 450
2 Display Citizen Board @ Rs. 800 Rs. 800
3 Any Other Lumpsum @ Rs. 22399 Rs. 22399
Total Addition Component Amount (in Rs.): 23649
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 44996.447915739