| State: Odisha |
District: Jajpur |
Block: Bari |
Gram Panchayat: Bainsiria |
Work Code: OD/356/3395/118278/402007/00070524 (Repairing of CC road from Binapani Pathagara to Rama Raja Temple via Ramachandra Panda house)
Project Category: Road
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bari |
Proposal Date: - |
| Date of Commencement: 20-12-2025 |
Date of Completion: 31-12-2025 |
| Scheme Name: SFC Devolution of Fund |
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI |
| Project Sub-Category: CC Road |
Project Type: New Work |
| Name of Executant: Chirad Prasad Rout |
|
Administrative Approval Details
Approval No.: OD/356/3395/118278/402007/00070524/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3395/118278/402007/00070524/TS
Fund Sanction No.: 4520
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
13.55808384 |
6301.86431216 |
85441.204692569 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
16.62220476 |
216.23489289764 |
3594.3006660012 |
| 3 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
13.55808384 |
7737.68129792 |
104908.1317644 |
Total Amount (in Rs.): 193943.63712297
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Skilled
|
Un-Skilled
|
Semi-Skilled
|
| 562 |
462 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
13.55808384 |
Cubic Meter |
3.9 |
52.876526976 |
- |
- |
0.18 |
2.4404550912 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
16.62220476 |
Square Meter |
- |
- |
0.05 |
0.831110238 |
0.05 |
0.831110238 |
| 3 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
13.55808384 |
Cubic Meter |
4.6 |
62.367185664 |
- |
- |
0.68 |
9.2194970112 |
| Total Qty |
12.4910623404 |
115.24371264 |
0.831110238 |
| Rate Per Man Day |
562 |
462 |
512 |
| Total Amount |
7019.9770353048 |
53242.59523968 |
425.528441856 |
Total Labour Amount (in Rs.): 60688.100716841
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM104 |
BRM092 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
13.55808384 |
Cum |
2.29 |
31.0480119936 |
0.48 |
6.5078802432 |
0.96 |
13.0157604864 |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
16.62220476 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0443812867092 |
0.126 |
2.09439779976 |
- |
- |
| 3 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
13.55808384 |
Cum |
3.23 |
43.7926108032 |
0.45 |
6.101137728 |
- |
- |
- |
- |
- |
- |
0.9 |
12.202275456 |
| Total Qty |
74.8406227968 |
12.6090179712 |
13.0157604864 |
0.0443812867092 |
2.09439779976 |
12.202275456 |
| Rate Per Unit |
574.612 |
873.69 |
1894.51 |
58573.086 |
229.106 |
2294.31 |
| Total Amount |
43004.319946515 |
11016.372911258 |
24658.48839909 |
2599.5489232086 |
479.83910231181 |
27995.802601455 |
Total Material Amount (in Rs.): 109754.37188384
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM104 |
BRM092 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
13.55808384 |
Cum |
2.29 |
31.0480119936 |
0.48 |
6.5078802432 |
0.96 |
13.0157604864 |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
16.62220476 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.0443812867092 |
0.000614 |
0.01020603372264 |
- |
- |
| 3 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
13.55808384 |
Cum |
3.23 |
43.7926108032 |
0.45 |
6.101137728 |
- |
- |
- |
- |
- |
- |
0.9 |
12.202275456 |
| Total Qty |
74.8406227968 |
12.6090179712 |
13.0157604864 |
0.0443812867092 |
0.01020603372264 |
12.202275456 |
| Rate Per Unit |
0 |
274.25 |
444.5 |
0 |
0 |
444.5 |
| Total Amount |
0 |
3458.0231786016 |
5785.5055362048 |
0 |
0 |
5423.911440192 |
Total Royalty Amount (in Rs.): 14667.440154998
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
Rs. 2000
|
Rs. 2000 |
| 2 |
Display Citizen Board @
Rs. 4056
|
Rs. 4056 |
Total Addition Component Amount (in Rs.): 6056
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 199999.63712297