State: Odisha District: Cuttack Block: Tigiria Gram Panchayat: Panchagaon
Work Code: OD/350/3345/117176/398985/00073200 (Construction of CC Road from Santosh Kumar Singh Samant House to Sunil Das House ( Badal), Panchagaon)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tigiria Proposal Date: 30-11-2024
Date of Commencement: 27-01-2026 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Mihir Kumar Sethy
Administrative Approval Details
Approval No.: OD/350/3345/117176/398985/00073200/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3345/117176/398985/00073200/TS
Fund Sanction No.: 5132
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 20.99877 7022.17385582 147457.01369838
Total Amount (in Rs.): 147457.01369838
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
462 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.99877 Cubic Meter 4.6 96.594342 0.68 14.2791636
Total Qty 96.594342 14.2791636
Rate Per Man Day 462 562
Total Amount 44626.586004 8024.8899432
Total Labour Amount (in Rs.): 52651.4759472
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.99877 Cum 3.23 67.8260271 0.45 9.4494465 0.9 18.898893
Total Qty 67.8260271 9.4494465 18.898893
Rate Per Unit 563.767 808.59 1846.31
Total Amount 38238.075820086 7640.727945435 34893.21513483
Total Material Amount (in Rs.): 80772.018900351
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.99877 Cum 3.23 67.8260271 0.45 9.4494465 0.9 18.898893
Total Qty 67.8260271 9.4494465 18.898893
Rate Per Unit 0 75.25 279.5
Total Amount 0 711.070849125 5282.2405935
Total Royalty Amount (in Rs.): 5993.311442625
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ Rs. 1500 Rs. 1500
2 Display Citizen Board @ Rs. 500 Rs. 500
Total Addition Component Amount (in Rs.): 2000
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 149457.01369838