| State: Odisha |
District: Puri |
Block: Astaranga |
Gram Panchayat: Naiguan |
Work Code: OD/369/3536/120884/409115/00074441 (CONSTRUCTION OF COMMUNITY CENTRE ,NAIGUAN)
Project Category: Building
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Astaranga |
Proposal Date: - |
| Date of Commencement: 05-02-2026 |
Date of Completion: - |
| Scheme Name: Bikashita Gaon Bikashita Odisha |
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) |
| Project Sub-Category: Community Centre |
Project Type: Completion |
| Name of Executant: PRIYAMBADA PRADHAN |
|
Administrative Approval Details
Approval No.: OD/369/3536/120884/409115/00074441/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3536/120884/409115/00074441/TS
Fund Sanction No.: 6142
Fund Sanction Amount (in Rs.): 666167
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Masonry Brick Work (AR0603bi) : First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge.
|
Cum |
22.6662 |
5535.104245128 |
125459.77984092 |
| 2 |
R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc)
|
Cum |
3.708375 |
16746.773582759 |
62103.316484964 |
| 3 |
R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels)
|
Cum |
1.654 |
15077.010592212 |
24937.375519519 |
| 4 |
R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade)
|
Cum |
9.308125 |
14642.130803243 |
136290.78378294 |
| 5 |
R.C.C. Work (AR0409) : First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge.
|
Qntl |
13.98 |
7976.2184095 |
111507.53336481 |
| 6 |
Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.
|
Sqm |
206.5619 |
255.744810032 |
52827.133875349 |
| 7 |
Plastering (AR1027) : First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge.
|
Sqm |
67.6834 |
196.1553837928 |
13276.463303402 |
| 8 |
Other Building Items. (AR1901B) : First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only)
|
Sqm |
62.5944 |
1022.4567562806 |
64000.06718533 |
| 9 |
Painting (AR0917g) : First Floor - Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside)
|
Sqm |
82.96 |
95.403997640444 |
7914.7156442512 |
Total Amount (in Rs.): 598317.16900148
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Highly-Skilled
|
Semi-Skilled
|
| 462 |
562 |
612 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Masonry Brick Work (AR0603bi) : First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge.
|
22.6662 |
Cubic Meter |
3.404 |
77.1557448 |
- |
- |
1.2075 |
27.3694365 |
0.4025 |
9.1231455 |
| 2 |
R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc)
|
3.708375 |
Cubic Meter |
1.533295 |
5.686032845625 |
6.352395 |
23.557062808125 |
6.4015 |
23.7391625625 |
- |
- |
| 3 |
R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels)
|
1.654 |
Cubic Meter |
1.533295 |
2.53606993 |
2.758395 |
4.56238533 |
2.8075 |
4.643605 |
- |
- |
| 4 |
R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade)
|
9.308125 |
Cubic Meter |
1.533295 |
14.272101521875 |
3.732195 |
34.739737584375 |
3.7813 |
35.1968130625 |
- |
- |
| 5 |
R.C.C. Work (AR0409) : First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge.
|
13.98 |
Quintal |
0.84 |
11.7432 |
0.0462 |
0.645876 |
- |
- |
0.315 |
4.4037 |
| 6 |
Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.
|
206.5619 |
Square Meter |
0.2472 |
51.06210168 |
- |
- |
0.1648 |
34.04140112 |
- |
- |
| 7 |
Plastering (AR1027) : First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge.
|
67.6834 |
Square Meter |
0.1751 |
11.85136334 |
- |
- |
0.1442 |
9.75994628 |
- |
- |
| 8 |
Other Building Items. (AR1901B) : First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only)
|
62.5944 |
Square Meter |
0.2268 |
14.19640992 |
- |
- |
- |
- |
0.2268 |
14.19640992 |
| 9 |
Painting (AR0917g) : First Floor - Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside)
|
82.96 |
Square Meter |
0.0756 |
6.271776 |
- |
- |
- |
- |
0.06825 |
5.66202 |
| Total Qty |
194.7748000375 |
134.750364525 |
33.38527542 |
63.5050617225 |
| Rate Per Man Day |
462 |
562 |
612 |
512 |
| Total Amount |
89985.957617325 |
75729.70486305 |
20431.78855704 |
32514.59160192 |
Total Labour Amount (in Rs.): 218662.04263934
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRMMR0025 |
BRM340 |
BRM028 |
BRM005 |
BRM060 |
BRM052 |
BRM084 |
BRM104 |
BRM094 |
BRM162 |
BRM341 |
BRM174 |
BRM131 |
BRM143 |
BRM252 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
22.6662 |
Cum |
1 |
22.6662 |
0.672 |
15.2316864 |
0.28 |
6.346536 |
350 |
7933.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) |
3.708375 |
Cum |
- |
- |
3.4733 |
12.8802988875 |
0.45 |
1.66876875 |
- |
- |
0.36 |
1.335015 |
0.54 |
2.0025225 |
5.30352 |
19.66744098 |
0.0498348 |
0.18480612645 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) |
1.654 |
Cum |
- |
- |
3.4733 |
5.7448382 |
0.45 |
0.7443 |
- |
- |
0.36 |
0.59544 |
0.54 |
0.89316 |
- |
- |
0.0889602 |
0.1471401708 |
4.5234 |
7.4817036 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) |
9.308125 |
Cum |
- |
- |
3.4733 |
32.3299105625 |
0.45 |
4.18865625 |
- |
- |
0.36 |
3.350925 |
0.54 |
5.0263875 |
7.46592 |
69.4937166 |
0.06026064 |
0.5609135697 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. |
13.98 |
Qntl |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.8 |
11.184 |
1.05 |
14.679 |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. |
206.5619 |
Sqm |
- |
- |
0.043 |
8.8821617 |
0.018 |
3.7181142 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Plastering (AR1027) :.First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. |
67.6834 |
Sqm |
- |
- |
0.0372 |
2.51782248 |
0.0075 |
0.5076255 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Other Building Items. (AR1901B) :.First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) |
62.5944 |
Sqm |
- |
- |
0.1074 |
6.72263856 |
0.021 |
1.3144824 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.0076 |
0.47571744 |
1 |
62.5944 |
- |
- |
- |
- |
| 9 |
Painting(AR0917g) :.First Floor - Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
82.96 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.166 |
13.77136 |
0.07812 |
6.4808352 |
| Total Qty |
22.6662 |
84.30935679 |
18.4884831 |
7933.17 |
5.28138 |
7.92207 |
89.16115758 |
0.89285986695 |
7.4817036 |
11.184 |
14.679 |
0.47571744 |
62.5944 |
13.77136 |
6.4808352 |
| Rate Per Unit |
33 |
572.817 |
897.85 |
6.36005 |
2685.38 |
2649 |
250.166 |
58573.086 |
240.106 |
90.1 |
5831.587 |
2041.967 |
660.6811111 |
47.83 |
125.74787 |
| Total Amount |
747.9846 |
48293.832828377 |
16599.884551335 |
50455.3578585 |
14182.5122244 |
20985.56343 |
22305.090147158 |
52297.557772811 |
1796.4019245816 |
1007.6784 |
85601.865573 |
971.39931380448 |
41354.937740638 |
658.6841488 |
814.95122222102 |
Total Material Amount (in Rs.): 358073.70173563
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM005 |
BRM060 |
BRM052 |
BRM084 |
BRM104 |
BRM094 |
BRM341 |
BRM174 |
BRM131 |
BRM252 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
22.6662 |
Cum |
0.672 |
15.2316864 |
0.28 |
6.346536 |
350 |
7933.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) |
3.708375 |
Cum |
3.4733 |
12.8802988875 |
0.45 |
1.66876875 |
- |
- |
0.36 |
1.335015 |
0.54 |
2.0025225 |
0.0544068 |
0.20176081695 |
0.0498348 |
0.18480612645 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) |
1.654 |
Cum |
3.4733 |
5.7448382 |
0.45 |
0.7443 |
- |
- |
0.36 |
0.59544 |
0.54 |
0.89316 |
- |
- |
0.0889602 |
0.1471401708 |
0.0594504 |
0.0983309616 |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) |
9.308125 |
Cum |
3.4733 |
32.3299105625 |
0.45 |
4.18865625 |
- |
- |
0.36 |
3.350925 |
0.54 |
5.0263875 |
0.0919908 |
0.85626186525 |
0.06026064 |
0.5609135697 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. |
13.98 |
Qntl |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1.05 |
14.679 |
- |
- |
- |
- |
- |
- |
| 6 |
Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. |
206.5619 |
Sqm |
0.043 |
8.8821617 |
0.018 |
3.7181142 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Plastering (AR1027) :.First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. |
67.6834 |
Sqm |
0.0372 |
2.51782248 |
0.0075 |
0.5076255 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Other Building Items. (AR1901B) :.First floor - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) |
62.5944 |
Sqm |
0.1074 |
6.72263856 |
0.021 |
1.3144824 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.0076 |
0.47571744 |
1 |
62.5944 |
- |
- |
| 9 |
Painting(AR0917g) :.First Floor - Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
82.96 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.07812 |
6.4808352 |
| Total Qty |
84.30935679 |
18.4884831 |
7933.17 |
5.28138 |
7.92207 |
1.0580226822 |
0.89285986695 |
0.0983309616 |
14.679 |
0.47571744 |
62.5944 |
6.4808352 |
| Rate Per Unit |
0 |
75.25 |
0 |
309.5 |
309.5 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
| Total Amount |
0 |
1391.258353275 |
0 |
1634.58711 |
2451.880665 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 5477.726128275
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
Rs. 6662
|
Rs. 6662 |
| 2 |
Any Other Lumpsum @
Rs. 54525
|
Rs. 54525 |
Total Addition Component Amount (in Rs.): 61187
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 659504.16900148