State: Odisha District: Puri Block: Sadar Gram Panchayat: Malatipatpur
Work Code: OD/369/3545/121077/409793/00013575 (Imp of Road from Danda Sahi Bateswari Thakurani to Bandha rasta Malatipatapur GP)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Sadar Proposal Date: 15-07-2021
Date of Commencement: 12-03-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Tapabanta Sahoo
Administrative Approval Details
Approval No.: OD/369/3545/121077/409793/00013575/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3545/121077/409793/00013575/TS
Fund Sanction No.: 11088
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
462 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.8 Cubic Meter 0.1236 1.70568 - -
2 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 13.8 Cubic Meter 3.9 53.82 0.18 2.484
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13.8 Cubic Meter 4.6 63.48 0.68 9.384
Total Qty 119.00568 11.868
Rate Per Man Day 462 562
Total Amount 54980.62416 6669.816
Total Labour Amount (in Rs.): 61650.44016