State: Odisha District: Nayagarh Block: Nayagarh Gram Panchayat: Baunsiapada
Work Code: OD/367/3527/120657/406292/00013791 (REN. & DEV OF BALARAMPUR JODASTA POKHARI)
Project Category: Water Body
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Nayagarh Proposal Date: 17-11-2023
Date of Commencement: 27-04-2025 Date of Completion: 28-06-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Embankment Project Type: New Work
Name of Executant: Ranjan Kumar Dora
Administrative Approval Details
Approval No.: OD/367/3527/120657/406292/00013791/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3527/120657/406292/00013791/TS
Fund Sanction No.: 14249
Fund Sanction Amount (in Rs.): 100000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
452 552 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 14.82 Cubic Meter 0.516 7.64712 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.8525 Cubic Meter 0.1236 0.228969 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.31625 Cubic Meter 3.9 63.633375 - - 0.18 2.936925
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 39.9 Square Meter - - 0.05 1.995 0.05 1.995
Total Qty 71.509464 4.931925 1.995
Rate Per Man Day 452 552 502
Total Amount 32322.277728 2722.4226 1001.49
Total Labour Amount (in Rs.): 36046.190328