State: Odisha District: Kendujhar Block: Kendujhar Sadar Gram Panchayat: Sirispal
Work Code: OD/361/3452/119472/386211/00013827 (Maintainance and Improvement of road from Labana Jena house to Hidyadhan Pradhan house)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Kendujhar Sadar Proposal Date: 14-07-2021
Date of Commencement: 03-04-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant: Manoj Kumar Sahoo
Administrative Approval Details
Approval No.: OD/361/3452/119472/386211/00013827/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3452/119472/386211/00013827/TS
Fund Sanction No.: 311
Fund Sanction Amount (in Rs.): 400000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
452 552 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai1) : Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth - Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 29.356577180176 Cubic Meter 0.503534 14.782034733843 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.690861830264 Cubic Meter 0.1236 2.1865905222206 - - - -
3 Concrete (AR0309) : Second floor - Cement Concrete (1:3:6) with 12mm size hard granite (Crusher Broken) chips including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 29.356577180176 Cubic Meter 6.0835 178.5907372756 - - 0.8993 26.400369858132
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.698 Cubic Meter 4.6 81.4108 - - 0.68 12.03464
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 63.003191383 Square Meter - - 0.05 3.15015956915 0.05 3.15015956915
Total Qty 276.97016253166 41.585169427282 3.15015956915
Rate Per Man Day 452 552 502
Total Amount 125190.51346431 22955.01352386 1581.3801037133
Total Labour Amount (in Rs.): 149726.90709189