| 1 |
Earth Work (AR0103a1) : Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m to 75m lead and 1.5m - Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the dept.
|
11.7656304 |
Cubic Meter |
0.7006 |
8.24300065824 |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
2.84303078928 |
Cubic Meter |
0.1236 |
0.35139860555501 |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
2.36645904528 |
Cubic Meter |
3.9 |
9.229190276592 |
- |
- |
0.18 |
0.4259626281504 |
- |
- |
| 4 |
Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.
|
71.06707888 |
Square Meter |
0.24 |
17.0560989312 |
- |
- |
0.16 |
11.3707326208 |
- |
- |
| 5 |
Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
12.237926384 |
Square Meter |
0.053763440860215 |
0.65795303139785 |
- |
- |
- |
- |
0.053763440860215 |
0.65795303139785 |
| 6 |
R.C.C. Work (AR0404A) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering)
|
6.0422458632 |
Cubic Meter |
1.3333 |
8.0561264094046 |
0.0573 |
0.34622068796136 |
0.1 |
0.60422458632 |
- |
- |
| 7 |
Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge.
|
12.0840386576 |
Cubic Meter |
2.82 |
34.076989014432 |
- |
- |
1.05 |
12.68824059048 |
0.35 |
4.22941353016 |
| 8 |
Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside)
|
12.237926384 |
Square Meter |
0.11776344086022 |
1.4411803199738 |
- |
- |
- |
- |
0.10776344086022 |
1.3188010561338 |
| 9 |
Plastering (AR1004) : Fourth Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge.
|
60.66194288 |
Square Meter |
0.1350610572 |
8.1930661371788 |
- |
- |
0.1575712334 |
9.5585771600419 |
- |
- |
| 10 |
R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge.
|
4.5315 |
Quintal |
0.8 |
3.6252 |
0.044 |
0.199386 |
- |
- |
0.3 |
1.35945 |
| Total Qty |
90.930203383974 |
34.647737585792 |
7.5656176176917 |
0.54560668796136 |
| Rate Per Man Day |
452 |
552 |
602 |
502 |
| Total Amount |
41100.451929556 |
19125.551147357 |
4554.5018058504 |
273.8945573566 |