State: Odisha District: Kalahandi Block: Kesinga Gram Panchayat: Belakhandi
Work Code: OD/358/3416/118744/422273/00022788 (Const. of CC Road of Choudhurypada Gali at Sahajpati Talbhanra)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kesinga Proposal Date: 31-12-2024
Date of Commencement: 25-10-2025 Date of Completion: 27-10-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: TRILOCHAN BEHERA
Administrative Approval Details
Approval No.: OD/358/3416/118744/422273/00022788/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3416/118744/422273/00022788/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.2292 Cubic Meter 0.516 1.6662672 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 19.1204 Cubic Meter 0.1236 2.36328144 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.1968 Cubic Meter 3.9 78.76752 - - 0.18 3.635424
4 R.C.C. Work (AR0403A) : Reinforced cement concrete work of M-15 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-15 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 12.2596 Cubic Meter 1.33 16.305268 0.06 0.735576 0.1 1.22596
Total Qty 99.10233664 4.861384 0.735576
Rate Per Man Day 462 562 512
Total Amount 45785.27952768 2732.097808 376.614912
Total Labour Amount (in Rs.): 48893.99224768