State: Odisha District: Angul Block: Palalahada Gram Panchayat: Nizigarh
Work Code: OD/344/3282/115729/403538/00029302 (Construction of CC road at Sasan Sahi Gadhuaghata)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Palalahada Proposal Date: 25-05-2023
Date of Commencement: 25-07-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: SANJIB KUMAR MAHANTA
Administrative Approval Details
Approval No.: OD/344/3282/115729/403538/00029302/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3282/115729/403538/00029302/TS
Fund Sanction No.: 11360
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 18.912122386886 Cubic Meter 0.516 9.7586551516332 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.4238423100864 Cubic Meter 0.1236 1.1647869095267 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 19.110082105789 Cubic Meter 3.9 74.529320212577 - - 0.18 3.439814779042
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 48.937935824952 Square Meter - - 0.05 2.4468967912476 0.05 2.4468967912476
5 Concrete (AR0307) : Third floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 5.6130910756161 Cubic Meter 6.996025 39.269325492287 - - 1.034195 5.8050307249468
Total Qty 124.72208776602 11.691742295236 2.4468967912476
Rate Per Man Day 462 562 512
Total Amount 57621.604547903 6570.7591699229 1252.8111571188
Total Labour Amount (in Rs.): 65445.174874945