State: Odisha District: Balasore Block: Nilgiri Gram Panchayat: Chatrapur
Work Code: OD/346/3305/116235/393305/00029669 (Impvt. Of Road From Lagan Marandi House To Charan Hansda House At Bhudrubani)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Nilgiri Proposal Date: -
Date of Commencement: 22-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Mettalling Road Project Type: Upgradation or Improvement
Name of Executant: MADHUSMITA MOHANTY
Administrative Approval Details
Approval No.: OD/346/3305/116235/393305/00029669/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3305/116235/393305/00029669/TS
Fund Sanction No.: 13737
Fund Sanction Amount (in Rs.): 179735
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.2936608 Cubic Meter 0.516 1.1835289728 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.312262848 Cubic Meter 0.1236 1.1509956880128 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.38576832 Cubic Meter 3.9 48.304496448 - - 0.18 2.2294382976
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 33.1106292 Square Meter - - 0.05 1.65553146 0.05 1.65553146
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.09210752 Cubic Meter 4.6 46.423694592 - - 0.68 6.8626331136
Total Qty 97.062715700813 10.7476028712 1.65553146
Rate Per Man Day 462 562 512
Total Amount 44842.974653776 6040.1528136144 847.63210752
Total Labour Amount (in Rs.): 51730.75957491