State: Odisha District: Jharsuguda Block: Laikera Gram Panchayat: Pakelpada
Work Code: OD/357/3407/118556/381169/00031484 (Improvement of Road from PWD Raod to Khajuriakhaman Utility Center)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Laikera Proposal Date: -
Date of Commencement: 29-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: SWMITI PRAVA NAIK
Administrative Approval Details
Approval No.: OD/357/3407/118556/381169/00031484/AS
Technical Sanction Details
Technical Sanction No.: OD/357/3407/118556/381169/00031484/TS
Fund Sanction No.: 11827
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 20.79585792 Cubic Meter 0.516 10.73066268672 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 51.58188288 Cubic Meter 0.1236 6.375520723968 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 22.49486592 Cubic Meter 3.9 87.729977088 - - 0.18 4.0490758656
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.94152448 Cubic Meter 4.6 82.531012608 - - 0.68 12.2002366464
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 29.72896 Square Meter - - 0.05 1.486448 0.05 1.486448
Total Qty 187.36717310669 17.735760512 1.486448
Rate Per Man Day 462 562 512
Total Amount 86563.63397529 9967.497407744 761.061376
Total Labour Amount (in Rs.): 97292.192759034