State: Odisha District: Kandhamal Block: Phiringia Gram Panchayat: Sadingia
Work Code: OD/359/3429/118974/416268/00031766 (Improvement Of Road From RD Road To Kiamunda UP School)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Phiringia Proposal Date: -
Date of Commencement: 22-07-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Pavor Block Project Type: Upgradation or Improvement
Name of Executant: SUNIL KUMAR PATRA
Administrative Approval Details
Approval No.: OD/359/3429/118974/416268/00031766/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3429/118974/416268/00031766/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
462 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.9176872 Cubic Meter 0.516 5.6335265952 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.2482764 Cubic Meter 0.1236 3.61508696304 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.4423 Cubic Meter 3.9 64.12497 0.18 2.959614
Total Qty 73.37358355824 2.959614
Rate Per Man Day 462 562
Total Amount 33898.595603907 1663.303068
Total Labour Amount (in Rs.): 35561.898671907