State: Odisha District: Koraput Block: Jeypore Gram Panchayat: Pujariput
Work Code: OD/363/3470/119794/428276/00035691 (REPAIR AND RENOVATION OF DANGARIAGUDA TANK AT DANGARIAGUDA)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Jeypore Proposal Date: -
Date of Commencement: 29-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Preservation and Development of Water Bodies
Project Sub-Category: Tank Project Type: Renovation or Rejuvenation
Name of Executant: BHABANI SANKAR PATRA
Administrative Approval Details
Approval No.: OD/363/3470/119794/428276/00035691/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3470/119794/428276/00035691/TS
Fund Sanction No.: 34998
Fund Sanction Amount (in Rs.): 663694
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 25.56 Cubic Meter 0.516 13.18896 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 62.4 Cubic Meter 0.1236 7.71264 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 28.98 Cubic Meter 3.9 113.022 - - 0.18 5.2164
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 96.6 Square Meter - - 0.05 4.83 0.05 4.83
6 Masonry Stone Work (AR0712) : Dry stone masonry or rough stone dry masonary. - Dry stone masonry or rough stone dry masonary for guard walls and retaining walls with hard granite stones of size not less than 0.0025 cum stacked including cost, conveyance, royalty, taxes of all materials, labour required for the work etc. complete and as per direction of Engineer-in charge. 187.2 Cubic Meter 0.87 162.864 0.52 97.344 0.52 97.344
Total Qty 296.7876 107.3904 102.174
Rate Per Man Day 462 562 512
Total Amount 137115.8712 60353.4048 52313.088
Total Labour Amount (in Rs.): 249782.364