State: Odisha District: Khordha Block: Balianta Gram Panchayat: Umadeibramhapur
Work Code: OD/362/3456/119549/407577/00039202 (CONST./IMP. OF PAVER BLOCK FROM GADASRIRAMPUR AWC BUILDING TO PANESWARTI TEMPLE WARD NO-3)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Balianta Proposal Date: -
Date of Commencement: 31-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: Pavor Block Project Type: Repair and Maintenance
Name of Executant: ASHOK KUMAR MISHRA
Administrative Approval Details
Approval No.: OD/362/3456/119549/407577/00039202/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3456/119549/407577/00039202/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 186532
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.45 Cubic Meter 0.516 3.3282 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.2 Cubic Meter 0.1236 2.12592 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.525 Cubic Meter 3.9 29.3475 - - 0.18 1.3545
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 30.1 Square Meter - - 0.05 1.505 0.05 1.505
Total Qty 34.80162 2.8595 1.505
Rate Per Man Day 462 562 512
Total Amount 16078.34844 1607.039 770.56
Total Labour Amount (in Rs.): 18455.94744