State: Odisha District: Sambalpur Block: Bamra Gram Panchayat: Pindapathar
Work Code: OD/371/3558/121288/381321/00044351 (Preservation and Development of Dheto Pada Kata , Parmanpur)
Project Category: Water Body
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bamra Proposal Date: 15-04-2023
Date of Commencement: 04-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Preservation and Development of Water Bodies
Project Sub-Category: Inlet or Outlet or Surplus Escape Project Type: Renovation or Rejuvenation
Name of Executant: manoranjanpradhanbamra
Administrative Approval Details
Approval No.: OD/371/3558/121288/381321/00044351/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3558/121288/381321/00044351/TS
Fund Sanction No.: 12441
Fund Sanction Amount (in Rs.): 663375
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 34.971248 Cubic Meter 0.516 18.045163968 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 36.387088 Cubic Meter 0.1236 4.4974440768 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 53.85289024 Cubic Meter 3.9 210.026271936 - - 0.18 9.6935202432
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 108.9566384 Square Meter - - 0.05 5.44783192 0.05 5.44783192
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 2.12376 Cubic Meter 4.6 9.769296 - - 0.68 1.4441568
Total Qty 242.3381759808 16.5855089632 5.44783192
Rate Per Man Day 462 562 512
Total Amount 111960.23730313 9321.0560373184 2789.28994304
Total Labour Amount (in Rs.): 124070.58328349