State: Odisha District: Nayagarh Block: Odagaon Gram Panchayat: Bhadikila
Work Code: OD/367/3529/275504/406535/00049596 (Renovation of Panchayat front Tank)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Odagaon Proposal Date: -
Date of Commencement: 15-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Tank Project Type: New Work
Name of Executant: Sradhanjali Sathua Mohapatra
Administrative Approval Details
Approval No.: OD/367/3529/275504/406535/00049596/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3529/275504/406535/00049596/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 29.34 Cubic Meter 0.516 15.13944 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 2.934 Cubic Meter 0.1236 0.3626424 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.97 Cubic Meter 3.9 120.783 - - 0.18 5.5746
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 76.95 Square Meter - - 0.05 3.8475 0.05 3.8475
Total Qty 136.2850824 9.4221 3.8475
Rate Per Man Day 462 562 512
Total Amount 62963.7080688 5295.2202 1969.92
Total Labour Amount (in Rs.): 70228.8482688