State: Odisha District: Kendujhar Block: Telkoi Gram Panchayat: Sirigida
Work Code: OD/361/3455/119532/386413/00049700 (Imrovement of Kundheihota Nua Pokhari)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Telkoi Proposal Date: -
Date of Commencement: 25-11-2025 Date of Completion: 06-01-2026
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: New Work
Name of Executant: Madhusmita Majhi
Administrative Approval Details
Approval No.: OD/361/3455/119532/386413/00049700/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3455/119532/386413/00049700/TS
Fund Sanction No.: 26956
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.00706718976 Cubic Meter 0.516 2.5836466699162 - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.06694942976 Cubic Meter 0.1236 0.50267494951834 - - - -
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 8.108798848 Cubic Meter 3.9 31.6243155072 - - 0.18 1.45958379264
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 86.6970796 Square Meter - - 0.05 4.33485398 0.05 4.33485398
6 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.530688 Cubic Meter 4.6 20.8411648 - - 0.68 3.08086784
Total Qty 55.551801926634 8.87530561264 4.33485398
Rate Per Man Day 462 562 512
Total Amount 25664.932490105 4987.9217543037 2219.44523776
Total Labour Amount (in Rs.): 32872.299482169