State: Odisha District: Koraput Block: Bandhugaon Gram Panchayat: Kutrabeda
Work Code: OD/363/3466/119712/428720/00049748 (Construction of Paver Block Road from RD Road to High School Mahaguda)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bandhugaon Proposal Date: 20-11-2024
Date of Commencement: 16-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: Pavor Block Project Type: New Work
Name of Executant: Manoj Kumar Sahoo
Administrative Approval Details
Approval No.: OD/363/3466/119712/428720/00049748/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3466/119712/428720/00049748/TS
Fund Sanction No.: 29781
Fund Sanction Amount (in Rs.): 414700
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
462 512 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 67.1492 Cubic Meter 0.516 34.6489872 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 32.4918 Cubic Meter 0.1236 4.01598648 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 162.08 Square Meter - - 0.05 8.104 0.05 8.104
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 18.6392 Cubic Meter 4.6 85.74032 - - 0.68 12.674656
Total Qty 124.40529368 8.104 20.778656
Rate Per Man Day 462 512 562
Total Amount 57475.24568016 4149.248 11677.604672
Total Labour Amount (in Rs.): 73302.09835216