State: Odisha District: Ganjam Block: Kabisuryanagar Gram Panchayat: Badamahuri
Work Code: OD/354/3376/117809/412166/00052346 (Completion of incomplete paver road at Loharadhepa)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Kabisuryanagar Proposal Date: -
Date of Commencement: 16-09-2025 Date of Completion: 04-10-2025
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: Pavor Block Project Type: New Work
Name of Executant: PRAMOD KUMAR PADHI
Administrative Approval Details
Approval No.: OD/354/3376/117809/412166/00052346/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3376/117809/412166/00052346/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 101919
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
462 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 1.55526 Cubic Meter 0.516 0.80251416 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.1585 Cubic Meter 0.1236 1.0083906 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.072 Cubic Meter 3.9 11.9808 0.18 0.55296
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.986 Cubic Meter 4.6 9.1356 0.68 1.35048
Total Qty 22.92730476 1.90344
Rate Per Man Day 462 562
Total Amount 10592.41479912 1069.73328
Total Labour Amount (in Rs.): 11662.14807912